Evaluating the Precision of the DC Decay Test Method for Characterizing Wound-Field Synchronous Machines in Power Plants

IF 3.3 Q3 ENERGY & FUELS
Frederic Maurer;Thomas Øyvang;Jonas Kristiansen Nøland
{"title":"Evaluating the Precision of the DC Decay Test Method for Characterizing Wound-Field Synchronous Machines in Power Plants","authors":"Frederic Maurer;Thomas Øyvang;Jonas Kristiansen Nøland","doi":"10.1109/OAJPE.2023.3312732","DOIUrl":null,"url":null,"abstract":"The sudden short-circuit test is the gold standard for determining the equivalent diagram of wound-field synchronous machines (WFSMs). Only a single measurement is needed while the machine is in saturated mode. However, this destructive test can significantly reduce the lifetime of the stator winding. Moreover, determining the equivalent diagram in the q-axis is more complicated and is often not performed. DC-decay tests are low-power alternatives that allow for the determination of the equivalent diagram in both axes without damaging the machinery. Until recently, they required the rotor to be aligned with the axes, which is not feasible in large power plants. A recent breakthrough eliminated the need for rotor alignment by proposing a DC-decay test that can be performed with the rotor in any position. However, numerous independent measurements are needed to obtain the equivalent diagram in both axes. This paper addresses the question of the minimum number of independent measurements needed for the DC-decay test to be practical for industrial use. Around 10 measurements are sufficient for reasonable precision, while 5 of high quality are sufficient using the symmetry of the root locus. Finally, a comparison against the short-circuit test shows that the DC-decay test is a valid alternative.","PeriodicalId":56187,"journal":{"name":"IEEE Open Access Journal of Power and Energy","volume":null,"pages":null},"PeriodicalIF":3.3000,"publicationDate":"2023-09-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://ieeexplore.ieee.org/stamp/stamp.jsp?tp=&arnumber=10243408","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE Open Access Journal of Power and Energy","FirstCategoryId":"1085","ListUrlMain":"https://ieeexplore.ieee.org/document/10243408/","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENERGY & FUELS","Score":null,"Total":0}
引用次数: 0

Abstract

The sudden short-circuit test is the gold standard for determining the equivalent diagram of wound-field synchronous machines (WFSMs). Only a single measurement is needed while the machine is in saturated mode. However, this destructive test can significantly reduce the lifetime of the stator winding. Moreover, determining the equivalent diagram in the q-axis is more complicated and is often not performed. DC-decay tests are low-power alternatives that allow for the determination of the equivalent diagram in both axes without damaging the machinery. Until recently, they required the rotor to be aligned with the axes, which is not feasible in large power plants. A recent breakthrough eliminated the need for rotor alignment by proposing a DC-decay test that can be performed with the rotor in any position. However, numerous independent measurements are needed to obtain the equivalent diagram in both axes. This paper addresses the question of the minimum number of independent measurements needed for the DC-decay test to be practical for industrial use. Around 10 measurements are sufficient for reasonable precision, while 5 of high quality are sufficient using the symmetry of the root locus. Finally, a comparison against the short-circuit test shows that the DC-decay test is a valid alternative.
评价电厂绕组同步电机直流衰减试验方法的精度
突然短路试验是确定伤场同步电机等效图的金标准。当机器处于饱和模式时,只需要进行一次测量。然而,这种破坏性测试会显著降低定子绕组的使用寿命。此外,确定q轴上的等效图更为复杂,通常不执行。直流衰减测试是低功耗的替代方案,允许在不损坏机械的情况下确定两个轴的等效图。直到最近,他们要求转子与轴对齐,这在大型发电厂是不可行的。最近的一项突破消除了转子对准的需要,提出了一种直流衰减测试,可以与转子在任何位置进行。然而,要获得两个轴上的等效图,需要进行大量的独立测量。本文讨论了在工业上实际应用的直流衰减试验所需的最少独立测量次数的问题。10次左右的测量足以达到合理的精度,而5次高质量的测量就足以利用根轨迹的对称性。最后,与短路试验的对比表明,直流衰减试验是一种有效的替代方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
7.80
自引率
5.30%
发文量
45
审稿时长
10 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信