Application of external flood probabilistic safety assessment methodology to Prototype Fast Breeder Reactor

IF 6.5 3区 工程技术 Q1 ENGINEERING, GEOLOGICAL
M. Ramakrishnan, Pramod Kumar Sharma, A. Roshan, A. Pisharady, Magesh Mari Raj, P. Chithira, A. Arul, L. Bishnoi
{"title":"Application of external flood probabilistic safety assessment methodology to Prototype Fast Breeder Reactor","authors":"M. Ramakrishnan, Pramod Kumar Sharma, A. Roshan, A. Pisharady, Magesh Mari Raj, P. Chithira, A. Arul, L. Bishnoi","doi":"10.1080/17499518.2022.2144636","DOIUrl":null,"url":null,"abstract":"ABSTRACT This paper presents the methodology adopted, accident sequence analysis and salient results from the external flood probabilistic safety analysis exercise for Prototype Fast Breeder Reactor. The major steps performed are the probabilistic hazard estimation, fragility computation, system reliability modelling and risk quantification. The hazard analysis has been performed for rainfall, storm surge and tsunami as typically associated with a coastal site, from which correlation function relating flood level to the annual exceedance frequency is estimated. The fragility analysis of different safety systems is estimated by considering submergence mode of failure using step fragility functions. The secondary effects of flood such as debris impact, load falling and flood-induced sodium fires are not considered. The human reliability analysis of manual operations necessary for plant safety is done for the control room as well as onsite actions. The challenges encountered during the analysis, salient results and uncertainties involved are presented with inferences. Abbreviations: AHX: air heat exchanger; CDF: core damage frequency; EFPSA: external flood probabilistic safety assessment; EL: elevation levels; EOP: emergency operation procedure; ET: event tree; FT: fault tree; HRA: human reliability analysis; IE: initiating events; NPP: nuclear power plant; OGDHRS: operation grade decay heat removal system; PFBR: prototype fast breeder reactor; POT: peak over threshold; PSA: probabilistic safety assessment; PTHA: probabilistic tsunami hazard assessment; RY: reactor year; RCB: reactor containment building; RP: return period; SGDHRS: safety grade decay heat removal system; SSC: structures, systems and components","PeriodicalId":48524,"journal":{"name":"Georisk-Assessment and Management of Risk for Engineered Systems and Geohazards","volume":"16 1","pages":"782 - 797"},"PeriodicalIF":6.5000,"publicationDate":"2022-10-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Georisk-Assessment and Management of Risk for Engineered Systems and Geohazards","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1080/17499518.2022.2144636","RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"ENGINEERING, GEOLOGICAL","Score":null,"Total":0}
引用次数: 0

Abstract

ABSTRACT This paper presents the methodology adopted, accident sequence analysis and salient results from the external flood probabilistic safety analysis exercise for Prototype Fast Breeder Reactor. The major steps performed are the probabilistic hazard estimation, fragility computation, system reliability modelling and risk quantification. The hazard analysis has been performed for rainfall, storm surge and tsunami as typically associated with a coastal site, from which correlation function relating flood level to the annual exceedance frequency is estimated. The fragility analysis of different safety systems is estimated by considering submergence mode of failure using step fragility functions. The secondary effects of flood such as debris impact, load falling and flood-induced sodium fires are not considered. The human reliability analysis of manual operations necessary for plant safety is done for the control room as well as onsite actions. The challenges encountered during the analysis, salient results and uncertainties involved are presented with inferences. Abbreviations: AHX: air heat exchanger; CDF: core damage frequency; EFPSA: external flood probabilistic safety assessment; EL: elevation levels; EOP: emergency operation procedure; ET: event tree; FT: fault tree; HRA: human reliability analysis; IE: initiating events; NPP: nuclear power plant; OGDHRS: operation grade decay heat removal system; PFBR: prototype fast breeder reactor; POT: peak over threshold; PSA: probabilistic safety assessment; PTHA: probabilistic tsunami hazard assessment; RY: reactor year; RCB: reactor containment building; RP: return period; SGDHRS: safety grade decay heat removal system; SSC: structures, systems and components
外淹概率安全评价方法在原型快中子增殖反应堆中的应用
本文介绍了原型快中子增殖反应堆外淹概率安全分析所采用的方法、事故序列分析和显著结果。主要步骤是概率危害估计、脆弱性计算、系统可靠性建模和风险量化。对通常与沿海地点有关的降雨、风暴潮和海啸进行了危害分析,从中估计了洪水水位与年超过频率的相关函数。利用阶跃易损性函数,考虑了不同安全系统的沉没破坏模式,对不同安全系统进行了易损性分析。洪水的次生效应,如碎片冲击、负荷下降和洪水引起的钠火灾等没有考虑。对控制室和现场操作进行了工厂安全所需的人工操作的人为可靠性分析。在分析过程中遇到的挑战,突出的结果和不确定性所涉及的推论提出。缩写:AHX:空气换热器;CDF:堆芯损坏频率;EFPSA:外部洪水概率安全评估;EL:海拔高度;EOP:紧急操作程序;ET:事件树;FT:故障树;HRA:人的可靠性分析;IE:发起事件;NPP:核电站;OGDHRS:运行级衰变排热系统;原型快中子增殖反应堆;POT:峰值超过阈值;PSA:概率安全评估;概率海啸灾害评估;RY:反应堆年;RCB:反应堆安全壳;RP:退货期;SGDHRS:安全级衰变排热系统;SSC:结构、系统和组件
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
8.70
自引率
10.40%
发文量
31
期刊介绍: Georisk covers many diversified but interlinked areas of active research and practice, such as geohazards (earthquakes, landslides, avalanches, rockfalls, tsunamis, etc.), safety of engineered systems (dams, buildings, offshore structures, lifelines, etc.), environmental risk, seismic risk, reliability-based design and code calibration, geostatistics, decision analyses, structural reliability, maintenance and life cycle performance, risk and vulnerability, hazard mapping, loss assessment (economic, social, environmental, etc.), GIS databases, remote sensing, and many other related disciplines. The underlying theme is that uncertainties associated with geomaterials (soils, rocks), geologic processes, and possible subsequent treatments, are usually large and complex and these uncertainties play an indispensable role in the risk assessment and management of engineered and natural systems. Significant theoretical and practical challenges remain on quantifying these uncertainties and developing defensible risk management methodologies that are acceptable to decision makers and stakeholders. Many opportunities to leverage on the rapid advancement in Bayesian analysis, machine learning, artificial intelligence, and other data-driven methods also exist, which can greatly enhance our decision-making abilities. The basic goal of this international peer-reviewed journal is to provide a multi-disciplinary scientific forum for cross fertilization of ideas between interested parties working on various aspects of georisk to advance the state-of-the-art and the state-of-the-practice.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信