Production planning with price-dependent supply capacity

Z. M. Teksan, J. Geunes
{"title":"Production planning with price-dependent supply capacity","authors":"Z. M. Teksan, J. Geunes","doi":"10.1080/0740817X.2016.1189628","DOIUrl":null,"url":null,"abstract":"ABSTRACT We consider a production planning problem in which a producer procures an input component for production by offering a price to suppliers. The available supply quantity for the production input depends on the price the producer offers, and this supply level constrains production output. The producer seeks to meet a set of demands over a finite horizon at a minimum cost, including component procurement costs. We model the problem as a discrete-time production and component supply–pricing planning problem with nonstationary costs, demands, and component supply levels. This leads to a two-level lot-sizing problem with an objective function that is neither concave nor convex. Although the most general version of the problem is -hard, we provide polynomial-time algorithms for two special cases of the model under particular assumptions on the cost structure. We then apply the resulting algorithms heuristically to the more general problem version and provide computational results that demonstrate the high performance quality of the resulting heuristic solution methods.","PeriodicalId":13379,"journal":{"name":"IIE Transactions","volume":"48 1","pages":"938 - 954"},"PeriodicalIF":0.0000,"publicationDate":"2016-05-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1080/0740817X.2016.1189628","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IIE Transactions","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/0740817X.2016.1189628","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

ABSTRACT We consider a production planning problem in which a producer procures an input component for production by offering a price to suppliers. The available supply quantity for the production input depends on the price the producer offers, and this supply level constrains production output. The producer seeks to meet a set of demands over a finite horizon at a minimum cost, including component procurement costs. We model the problem as a discrete-time production and component supply–pricing planning problem with nonstationary costs, demands, and component supply levels. This leads to a two-level lot-sizing problem with an objective function that is neither concave nor convex. Although the most general version of the problem is -hard, we provide polynomial-time algorithms for two special cases of the model under particular assumptions on the cost structure. We then apply the resulting algorithms heuristically to the more general problem version and provide computational results that demonstrate the high performance quality of the resulting heuristic solution methods.
供应能力与价格相关的生产计划
我们考虑一个生产计划问题,其中生产商通过向供应商提供价格来采购生产所需的投入部件。生产投入的可用供应量取决于生产者提供的价格,而这种供应水平限制了生产产出。生产商寻求在有限的时间内以最低的成本(包括零部件采购成本)满足一系列需求。我们将该问题建模为具有非平稳成本、需求和组件供应水平的离散时间生产和组件供应定价计划问题。这导致了一个目标函数既非凹也非凸的两级批量问题。虽然这个问题的最一般版本是困难的,但我们在特定的成本结构假设下,为模型的两种特殊情况提供了多项式时间算法。然后,我们将结果算法启发式地应用于更一般的问题版本,并提供计算结果,证明结果启发式解决方法的高性能质量。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
IIE Transactions
IIE Transactions 工程技术-工程:工业
自引率
0.00%
发文量
0
审稿时长
4.5 months
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信