Tuna field, a recent Gippsland development

IF 0.1 4区 工程技术
Oil & Gas Journal Pub Date : 1983-05-09 DOI:10.1071/AJ82005
M. O'Byrne, D. J. Henderson
{"title":"Tuna field, a recent Gippsland development","authors":"M. O'Byrne, D. J. Henderson","doi":"10.1071/AJ82005","DOIUrl":null,"url":null,"abstract":"Successfully completed in 1982, the Tuna field in Australia's Gippsland basin was the most complex of the fields developed by Esso in that area. The commercial oil and gas reserves are contained in four sets of reservoirs in the Upper Cretaceous to Eocene Latrobe group sediments in a faulted and partly eroded anticlinal closure. Some of these reservoirs were not discovered until the development phase of drilling, causing significant changes to the initial development plan, notably the installation of multiple completions in 13 wells. The types of completions used were single, tandem, dual, and dual/tandem.","PeriodicalId":19415,"journal":{"name":"Oil & Gas Journal","volume":"81 1","pages":""},"PeriodicalIF":0.1000,"publicationDate":"1983-05-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Oil & Gas Journal","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1071/AJ82005","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

Abstract

Successfully completed in 1982, the Tuna field in Australia's Gippsland basin was the most complex of the fields developed by Esso in that area. The commercial oil and gas reserves are contained in four sets of reservoirs in the Upper Cretaceous to Eocene Latrobe group sediments in a faulted and partly eroded anticlinal closure. Some of these reservoirs were not discovered until the development phase of drilling, causing significant changes to the initial development plan, notably the installation of multiple completions in 13 wells. The types of completions used were single, tandem, dual, and dual/tandem.
金枪鱼油田,吉普斯兰最近开发的一个项目
位于澳大利亚吉普斯兰盆地的Tuna油田于1982年成功完工,是埃索公司在该地区开发的最复杂的油田。在上白垩统至始新统拉特罗布群断陷部分侵蚀背斜闭包中,有4套储层。其中一些储层直到钻井开发阶段才被发现,导致最初的开发计划发生重大变化,特别是在13口井中安装了多口完井。使用的完井类型有单、串联、双、双/串联。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Oil & Gas Journal
Oil & Gas Journal ENERGY & FUELSENGINEERING, PETROLEUM-ENGINEERING, PETROLEUM
自引率
0.00%
发文量
0
审稿时长
2.7 months
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信