Optimizing service restoration in distribution systems based on scheduling of crews considering priorities of loads

IF 0.4 4区 工程技术 Q4 ENGINEERING, ELECTRICAL & ELECTRONIC
Shinya Sekizaki, Teruyuki Kato, Ichiro Nishizaki, Tomohiro Hayashida, Kazuhisa Hikoyama, Tomoaki Nonoyama
{"title":"Optimizing service restoration in distribution systems based on scheduling of crews considering priorities of loads","authors":"Shinya Sekizaki,&nbsp;Teruyuki Kato,&nbsp;Ichiro Nishizaki,&nbsp;Tomohiro Hayashida,&nbsp;Kazuhisa Hikoyama,&nbsp;Tomoaki Nonoyama","doi":"10.1002/eej.23442","DOIUrl":null,"url":null,"abstract":"<p>The service restoration to sound sections within a short period as much as possible, performed after the permanent fault occurs in a distribution system, is significant for maintaining power supply reliability. This paper proposes an efficient method to find service restoration procedures based on fault searching and the optimal work scheduling of crews, considering the power supply priorities of loads and the probability of occurrence of faults. The proposed method is composed of two-stage problems to reduce the outage sections efficiently: (i) the problem to find a series of searching procedures for unknown fault locations in the first stage and (ii) the optimization problem of work schedules of crews in the second stage. In the first stage, the order of operation of switches opened for searching for the fault direction is determined, constituting the searching tree. After that, the proposed optimization method can efficiently solve the work scheduling problem by formulating it as a mixed-integer linear programming problem in the second stage. The computational experiments using a large-scale distribution system model with many remote and manual switches show that the proposed method can provide efficient service restoration procedures within a reasonable computational time.</p>","PeriodicalId":50550,"journal":{"name":"Electrical Engineering in Japan","volume":"216 3","pages":""},"PeriodicalIF":0.4000,"publicationDate":"2023-08-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Electrical Engineering in Japan","FirstCategoryId":"5","ListUrlMain":"https://onlinelibrary.wiley.com/doi/10.1002/eej.23442","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, ELECTRICAL & ELECTRONIC","Score":null,"Total":0}
引用次数: 0

Abstract

The service restoration to sound sections within a short period as much as possible, performed after the permanent fault occurs in a distribution system, is significant for maintaining power supply reliability. This paper proposes an efficient method to find service restoration procedures based on fault searching and the optimal work scheduling of crews, considering the power supply priorities of loads and the probability of occurrence of faults. The proposed method is composed of two-stage problems to reduce the outage sections efficiently: (i) the problem to find a series of searching procedures for unknown fault locations in the first stage and (ii) the optimization problem of work schedules of crews in the second stage. In the first stage, the order of operation of switches opened for searching for the fault direction is determined, constituting the searching tree. After that, the proposed optimization method can efficiently solve the work scheduling problem by formulating it as a mixed-integer linear programming problem in the second stage. The computational experiments using a large-scale distribution system model with many remote and manual switches show that the proposed method can provide efficient service restoration procedures within a reasonable computational time.

基于考虑负荷优先级的机组调度优化配电系统服务恢复
配电系统发生永久性故障后,在尽可能短的时间内恢复供电,对保持供电可靠性具有重要意义。本文在考虑负荷供电优先级和故障发生概率的基础上,提出了一种基于故障搜索和机组人员最优工作调度的服务恢复程序的有效方法。所提出的方法由两个阶段的问题组成,以有效地减少停电区间:(i)第一阶段寻找未知故障位置的一系列搜索程序的问题;(ii)第二阶段机组人员工作计划的优化问题。在第一阶段中,确定为搜索故障方向而打开的开关的操作顺序,构成搜索树。之后,所提出的优化方法可以在第二阶段将工作调度问题公式化为混合整数线性规划问题,从而有效地解决工作调度问题。使用具有许多远程和手动开关的大型配电系统模型进行的计算实验表明,该方法可以在合理的计算时间内提供高效的服务恢复过程。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Electrical Engineering in Japan
Electrical Engineering in Japan 工程技术-工程:电子与电气
CiteScore
0.80
自引率
0.00%
发文量
51
审稿时长
4-8 weeks
期刊介绍: Electrical Engineering in Japan (EEJ) is an official journal of the Institute of Electrical Engineers of Japan (IEEJ). This authoritative journal is a translation of the Transactions of the Institute of Electrical Engineers of Japan. It publishes 16 issues a year on original research findings in Electrical Engineering with special focus on the science, technology and applications of electric power, such as power generation, transmission and conversion, electric railways (including magnetic levitation devices), motors, switching, power economics.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信