PAS stakeholders & activities to achieve alignment

M. Arkesteijn
{"title":"PAS stakeholders & activities to achieve alignment","authors":"M. Arkesteijn","doi":"10.7480/ABE.2019.12.4132","DOIUrl":null,"url":null,"abstract":"PAS consists of three main components; steps, stakeholders & activities, and mathematical models, as explained in chapter 4. In this chapter, the stakeholders & activities are the focal point (see Figure 6.1). By explaining the interactive design process in detail, the reader understands how the stakeholders perform the activities to achieve alignment between the organization and the corporate real estate portfolio. \nThe stakeholders & activities are displayed in the left column of the flowchart in Figure 6.2. There, the stakeholders that are involved are divided in three types: the responsible management (RM), the stakeholders (S) and the facilitator and systems engineer (F & SE). They need to perform two types of activities: interviews and workshops. In the activity interviews, the stakeholders perform steps 1 to 4. In the activity workshops, the stakeholders perform step 5. They design an alternative corporate real estate portfolio and continue designing other alternatives until they mutually agree that the best possible alternative has been made. The activities are finished when, in the last interview, each stakeholder individually confirms the selection of the best alternative. \nThe results of the three pilots have been discussed in chapter 5 including the final input the stakeholders have given in the interviews for steps 1 to 4. The best alternative the stakeholders have chosen in step 6 was also presented. This alternative was designed interactively and iteratively in the workshops in step 5. However, how the stakeholders have designed this alterative has not yet been explained. Since, interactively and iteratively designing alternatives in the mathematical models is a major component of PAS this design process is explained in this chapter. This chapter shows the interfaces that the stakeholders can use when designing alternatives including instructions on how to navigate the model. \nThis chapter presents the pilots as follows: \n–– Pilot study 1: TU Delft’s food facilities in paragraph 6.1; \n–– Pilot study 2: TU Delft’s lecture halls in paragraph 6.2; \n–– Pilot study 3: Oracle’s office locations in paragraph; \n–– And the pilot study comparison and conclusion in paragraph 6.4. \nFor each pilot study, in the first subparagraph, the design interfaces that the stakeholders have at their disposal, are explained. In the second subparagraph, the stakeholders workshop set up is discussed in which they use the interface to design alternatives. Lastly, in the third subparagraph, the iterative process is discussed. The iteration takes place between step 5 (designiWng alternatives) and step 1 to 4 (variables, curves, weights and constraints).","PeriodicalId":30436,"journal":{"name":"ABE Architecture and the Built Environment","volume":"1 1","pages":"233-276"},"PeriodicalIF":0.0000,"publicationDate":"2019-11-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"ABE Architecture and the Built Environment","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.7480/ABE.2019.12.4132","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

PAS consists of three main components; steps, stakeholders & activities, and mathematical models, as explained in chapter 4. In this chapter, the stakeholders & activities are the focal point (see Figure 6.1). By explaining the interactive design process in detail, the reader understands how the stakeholders perform the activities to achieve alignment between the organization and the corporate real estate portfolio. The stakeholders & activities are displayed in the left column of the flowchart in Figure 6.2. There, the stakeholders that are involved are divided in three types: the responsible management (RM), the stakeholders (S) and the facilitator and systems engineer (F & SE). They need to perform two types of activities: interviews and workshops. In the activity interviews, the stakeholders perform steps 1 to 4. In the activity workshops, the stakeholders perform step 5. They design an alternative corporate real estate portfolio and continue designing other alternatives until they mutually agree that the best possible alternative has been made. The activities are finished when, in the last interview, each stakeholder individually confirms the selection of the best alternative. The results of the three pilots have been discussed in chapter 5 including the final input the stakeholders have given in the interviews for steps 1 to 4. The best alternative the stakeholders have chosen in step 6 was also presented. This alternative was designed interactively and iteratively in the workshops in step 5. However, how the stakeholders have designed this alterative has not yet been explained. Since, interactively and iteratively designing alternatives in the mathematical models is a major component of PAS this design process is explained in this chapter. This chapter shows the interfaces that the stakeholders can use when designing alternatives including instructions on how to navigate the model. This chapter presents the pilots as follows: –– Pilot study 1: TU Delft’s food facilities in paragraph 6.1; –– Pilot study 2: TU Delft’s lecture halls in paragraph 6.2; –– Pilot study 3: Oracle’s office locations in paragraph; –– And the pilot study comparison and conclusion in paragraph 6.4. For each pilot study, in the first subparagraph, the design interfaces that the stakeholders have at their disposal, are explained. In the second subparagraph, the stakeholders workshop set up is discussed in which they use the interface to design alternatives. Lastly, in the third subparagraph, the iterative process is discussed. The iteration takes place between step 5 (designiWng alternatives) and step 1 to 4 (variables, curves, weights and constraints).
PAS利益相关者和实现一致性的活动
PAS由三个主要组成部分组成;步骤、利益相关者和活动以及数学模型,如第4章所述。在本章中,利益相关者和活动是焦点(见图6.1)。通过详细解释交互式设计过程,读者了解利益相关者如何执行活动,以实现组织和公司房地产投资组合之间的一致性。利益相关者和活动显示在图6.2中流程图的左列中。在那里,所涉及的利益相关者分为三种类型:负责管理层(RM)、利益相关者(S)以及促进者和系统工程师(F&SE)。他们需要进行两种类型的活动:访谈和研讨会。在活动访谈中,利益相关者执行步骤1至4。在活动研讨会中,利益相关者执行步骤5。他们设计了一个替代性的公司房地产投资组合,并继续设计其他替代方案,直到他们一致认为已经做出了最好的替代方案。在最后一次访谈中,当每个利益相关者单独确认选择了最佳替代方案时,活动就结束了。第5章讨论了三个试点的结果,包括利益相关者在第1步至第4步的访谈中给出的最终意见。还介绍了利益相关者在步骤6中选择的最佳替代方案。这个替代方案是在步骤5的研讨会中以交互和迭代的方式设计的。然而,利益相关者是如何设计这种替代方案的,目前还没有解释。由于在数学模型中交互式和迭代地设计备选方案是PAS的主要组成部分,因此本章将解释该设计过程。本章展示了利益相关者在设计备选方案时可以使用的界面,包括如何导航模型的说明。本章介绍了试点项目如下:试点研究1:TU Delft的食品设施,见第6.1段试点研究2:TU Delft的演讲厅,见第6.2段试点研究3:第段中的Oracle办公地点以及第6.4段中的试点研究比较和结论。对于每个试点研究,在第一小节中,解释了利益相关者可支配的设计接口。在第二分段中,讨论了利益攸关方研讨会的设立,他们在研讨会上使用界面设计备选方案。最后,在第三小节中,讨论了迭代过程。迭代发生在步骤5(设计备选方案)和步骤1-4(变量、曲线、权重和约束)之间。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
审稿时长
8 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书