A construction–specific extension to a standard project risk management process

IF 1.6 Q3 MANAGEMENT
Dina Alfreahat, Z. Sebestyén
{"title":"A construction–specific extension to a standard project risk management process","authors":"Dina Alfreahat, Z. Sebestyén","doi":"10.2478/otmcj-2022-0011","DOIUrl":null,"url":null,"abstract":"Abstract Project processes are affected by risks in many ways, and this is particularly true in today's highly competitive world. Construction projects usually take much longer than typical projects in other sectors. In this sector, it is important to follow some kind of standardised risk management process. There is much literature on different approaches to project risk management, and this paper reviews the most prominent sources that suggest procedures that are widely used in practice. Nevertheless, standard risk management still faces some shortcomings, and professionals call for a more sophisticated solution. This research aims to expand the general risk management process based on the frameworks of the prestigious stand-ardisation institutions and associations (mainly on Project Management Institute's (PMI's) risk management standard considering the approaches of Institute of Risk Management (IRM), National Forum for Risk Management in the Public Sector (ALARM), Association of Insurance and Risk Managers (AIRMIC) and International Organization for Standardization (ISO), as well as Association for Project Management (APM)). The suggested two new processes are justified by in-depth interviews conducted with interviewees working on large and complex construction projects, and are supported by a thorough literature review. The novelty of the research is that these two processes added to the standard processes, namely, risk analysis verification and validation and risk plan experimentation. The research expectedly improves the risk management process in the construction sector and emphasises the need to clearly articulate and communicate the organisation's risk appetite and the necessity for risk management training to employees. Therefore, the research reconfirms the concept of project risk management by the standards, and justifies the proposed new phases.","PeriodicalId":42309,"journal":{"name":"Organization Technology and Management in Construction","volume":"14 1","pages":"2666 - 2674"},"PeriodicalIF":1.6000,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Organization Technology and Management in Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/otmcj-2022-0011","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 1

Abstract

Abstract Project processes are affected by risks in many ways, and this is particularly true in today's highly competitive world. Construction projects usually take much longer than typical projects in other sectors. In this sector, it is important to follow some kind of standardised risk management process. There is much literature on different approaches to project risk management, and this paper reviews the most prominent sources that suggest procedures that are widely used in practice. Nevertheless, standard risk management still faces some shortcomings, and professionals call for a more sophisticated solution. This research aims to expand the general risk management process based on the frameworks of the prestigious stand-ardisation institutions and associations (mainly on Project Management Institute's (PMI's) risk management standard considering the approaches of Institute of Risk Management (IRM), National Forum for Risk Management in the Public Sector (ALARM), Association of Insurance and Risk Managers (AIRMIC) and International Organization for Standardization (ISO), as well as Association for Project Management (APM)). The suggested two new processes are justified by in-depth interviews conducted with interviewees working on large and complex construction projects, and are supported by a thorough literature review. The novelty of the research is that these two processes added to the standard processes, namely, risk analysis verification and validation and risk plan experimentation. The research expectedly improves the risk management process in the construction sector and emphasises the need to clearly articulate and communicate the organisation's risk appetite and the necessity for risk management training to employees. Therefore, the research reconfirms the concept of project risk management by the standards, and justifies the proposed new phases.
标准项目风险管理流程的施工特定扩展
摘要项目过程在很多方面都会受到风险的影响,在当今竞争激烈的世界中尤其如此。建筑项目通常比其他行业的典型项目耗时更长。在这个行业,遵循某种标准化的风险管理流程是很重要的。关于项目风险管理的不同方法有很多文献,本文回顾了在实践中广泛使用的程序建议的最突出的来源。尽管如此,标准的风险管理仍然面临一些不足,专业人士呼吁采用更复杂的解决方案。本研究旨在基于著名的标准化机构和协会的框架(主要基于项目管理研究所(PMI)的风险管理标准,考虑到风险管理研究所、国家公共部门风险管理论坛,保险和风险经理协会(AIRMIC)和国际标准化组织(ISO)以及项目管理协会(APM))。对从事大型复杂建筑项目的受访者进行的深入采访证明了建议的两种新流程的合理性,并得到了全面文献综述的支持。该研究的新颖之处在于,这两个过程添加到了标准过程中,即风险分析验证和验证以及风险计划实验。该研究有望改善建筑行业的风险管理流程,并强调需要清楚地阐明和传达组织的风险偏好,以及向员工进行风险管理培训的必要性。因此,本研究通过标准重新确认了项目风险管理的概念,并证明了所提出的新阶段是合理的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
3.10
自引率
0.00%
发文量
8
审稿时长
16 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信