{"title":"Efficient utilisation of automation in construction materials-handling processes","authors":"P. Alumbugu, W. Shakantu, A. Tsado, W. Ola-awo","doi":"10.18820/24150487/as29i2.2","DOIUrl":null,"url":null,"abstract":"There is a limited understanding of automation in construction materials-handling processes utilised by manufacturing firms in Nigeria. This article evaluates the level of utilisation of automation in construction materials-handling operations by manufacturing firms in North-Central Nigeria, to improve operational efficiency and reduce operating costs. Using a case study research design, quantitative data (observation guide with measurements) were collected from 32 purposively selected construction-material manufacturers. A total of 72 customers’ orders were observed and recorded to be representative of deliveries from the sampled (n=32) manufacturers’ warehouses to other terminals. The descriptive method of data analysis was employed using percentages and results presented in a form of bar charts. The study reveals low-level utilisation of automation in the combined processes of order picking, storage, loading, and offloading of material. These imply increasing material costs and causing a delay in delivery. The article concludes by providing construction-material manufacturers with areas that require automation to optimise material-handling operations. A recommendation is made for further study to explore why automation is not utilised despite its advantage. ","PeriodicalId":42571,"journal":{"name":"Acta Structilia","volume":" ","pages":""},"PeriodicalIF":0.6000,"publicationDate":"2022-11-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Acta Structilia","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.18820/24150487/as29i2.2","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 1
Abstract
There is a limited understanding of automation in construction materials-handling processes utilised by manufacturing firms in Nigeria. This article evaluates the level of utilisation of automation in construction materials-handling operations by manufacturing firms in North-Central Nigeria, to improve operational efficiency and reduce operating costs. Using a case study research design, quantitative data (observation guide with measurements) were collected from 32 purposively selected construction-material manufacturers. A total of 72 customers’ orders were observed and recorded to be representative of deliveries from the sampled (n=32) manufacturers’ warehouses to other terminals. The descriptive method of data analysis was employed using percentages and results presented in a form of bar charts. The study reveals low-level utilisation of automation in the combined processes of order picking, storage, loading, and offloading of material. These imply increasing material costs and causing a delay in delivery. The article concludes by providing construction-material manufacturers with areas that require automation to optimise material-handling operations. A recommendation is made for further study to explore why automation is not utilised despite its advantage.