Lean Analysis Framework for Waste Management: A Case of Indonesian Textile Company

Widyatmoko Reza Prambudi, Ida Giyanti
{"title":"Lean Analysis Framework for Waste Management: A Case of Indonesian Textile Company","authors":"Widyatmoko Reza Prambudi, Ida Giyanti","doi":"10.25077/JOSI.V20.N1.P11-21.2021","DOIUrl":null,"url":null,"abstract":"This study aims to propose a lean analysis framework for waste management and to test it into the field case. The proposed framework was applied in a weaving process of a textile company in Indonesia. The seven classical Lean wastes were identified using value str e am mapping (VSM). The result was then analyzed using the waste assessment model within which waste relationship matrix (WRM) and waste assessment questionnaire (WAQ) according to the answers of the head of weaving division studied. The major source of wastes was then determined utilizing the value stream analysis tool (VALSAT). In order to thoroug h ly examine the root cause of such dominant wastes and to propose corrective plans to minimize the waste, a fishbone diagram was used. As the main result, this study provides a lean waste analysis framework with examples to orientate managers about wastes. Particula r ly in our specific case, the results demonstrate that the waiting and defect become the most significant wastes that need to be treated. These findings allow a company to organize its activities and select tools or practices to optimize its efforts to create proper corrective plans in eliminating waste. In our study, the plans include periodic maintenance of weaving machines, clear division of tasks on the distribution of weft yarns, and eliminating unnecessary activities. In addition, it is mandatory to ensure the quality of warp yarns delivered to the weaving process as well as to perform a periodic calibration of equipment on weaving machines. This study advances in the theoretical and practical field by showing a structured way to incorporate lean analysis that can be adopted for any organization.","PeriodicalId":30702,"journal":{"name":"Jurnal Optimasi Sistem Industri","volume":"20 1","pages":"11"},"PeriodicalIF":0.0000,"publicationDate":"2021-05-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Optimasi Sistem Industri","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.25077/JOSI.V20.N1.P11-21.2021","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

This study aims to propose a lean analysis framework for waste management and to test it into the field case. The proposed framework was applied in a weaving process of a textile company in Indonesia. The seven classical Lean wastes were identified using value str e am mapping (VSM). The result was then analyzed using the waste assessment model within which waste relationship matrix (WRM) and waste assessment questionnaire (WAQ) according to the answers of the head of weaving division studied. The major source of wastes was then determined utilizing the value stream analysis tool (VALSAT). In order to thoroug h ly examine the root cause of such dominant wastes and to propose corrective plans to minimize the waste, a fishbone diagram was used. As the main result, this study provides a lean waste analysis framework with examples to orientate managers about wastes. Particula r ly in our specific case, the results demonstrate that the waiting and defect become the most significant wastes that need to be treated. These findings allow a company to organize its activities and select tools or practices to optimize its efforts to create proper corrective plans in eliminating waste. In our study, the plans include periodic maintenance of weaving machines, clear division of tasks on the distribution of weft yarns, and eliminating unnecessary activities. In addition, it is mandatory to ensure the quality of warp yarns delivered to the weaving process as well as to perform a periodic calibration of equipment on weaving machines. This study advances in the theoretical and practical field by showing a structured way to incorporate lean analysis that can be adopted for any organization.
废弃物管理的精益分析框架:以印尼纺织公司为例
本研究旨在为废物管理提出一个精益分析框架,并在现场案例中进行测试。所提出的框架已应用于印度尼西亚一家纺织公司的织造过程。使用价值链映射(VSM)对七种经典的精益废物进行了识别。然后使用废物评估模型对结果进行分析,在该模型中,根据织造部门负责人的回答,研究了废物关系矩阵(WRM)和废物评估问卷(WAQ)。然后利用价值流分析工具(VALSAT)确定了废物的主要来源。为了深入检查这种主要废物的根本原因,并提出纠正计划以尽量减少废物,使用了鱼骨图。主要结果是,本研究提供了一个精益废物分析框架,并举例说明管理者对废物的认识。特别是在我们的具体案例中,结果表明,等待和缺陷成为需要处理的最重要的废物。这些发现使公司能够组织其活动并选择工具或实践来优化其努力,以制定适当的纠正计划来消除浪费。在我们的研究中,这些计划包括织机的定期维护、纬纱分配的明确任务分工以及消除不必要的活动。此外,必须确保交付到织造过程中的经纱质量,并定期校准织机上的设备。这项研究在理论和实践领域取得了进展,它展示了一种可用于任何组织的结构化方法来纳入精益分析。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
0.80
自引率
0.00%
发文量
6
审稿时长
13 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书