Function Point Analysis FPA on A Team Planning Website Based on PHP and MYSQL

A.K. Lassen
{"title":"Function Point Analysis FPA on A Team Planning Website Based on PHP and MYSQL","authors":"A.K. Lassen","doi":"10.4172/2165-7866.1000237","DOIUrl":null,"url":null,"abstract":"A function point analysis (FPA) has been carried out on a custom team planning website based on PHP and MYSQL. The FPA was done after the development was finished (retrospective) and a constructive cost model analysis (COCOMO) was carried out to asses source lines of code (SLOC). In the present study the function point analysis is based on entities of the relational database evaluated as internal logical files, and evaluation of PHP source code with dynamic SQL as either external input files or external inquiry files. The complexity for a custom team planning website was found to be 510 total adjusted function points (TAFP) (UAF=580 FP, TDI=23, VAF=0, 88, TAFP=510FP). The function point estimate was classified as an organic project in a COCOMO analysis, and it was concluded that the complexity corresponds to 27742 LOC (or 27, 4 KDSI). The estimate of 66-82 person-months project would correspond to a 4 crew team in 16-21 months. The estimate was compared to the actual source code count of 22300 LOC.","PeriodicalId":91908,"journal":{"name":"Journal of information technology & software engineering","volume":" ","pages":"1-5"},"PeriodicalIF":0.0000,"publicationDate":"2018-05-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of information technology & software engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4172/2165-7866.1000237","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

A function point analysis (FPA) has been carried out on a custom team planning website based on PHP and MYSQL. The FPA was done after the development was finished (retrospective) and a constructive cost model analysis (COCOMO) was carried out to asses source lines of code (SLOC). In the present study the function point analysis is based on entities of the relational database evaluated as internal logical files, and evaluation of PHP source code with dynamic SQL as either external input files or external inquiry files. The complexity for a custom team planning website was found to be 510 total adjusted function points (TAFP) (UAF=580 FP, TDI=23, VAF=0, 88, TAFP=510FP). The function point estimate was classified as an organic project in a COCOMO analysis, and it was concluded that the complexity corresponds to 27742 LOC (or 27, 4 KDSI). The estimate of 66-82 person-months project would correspond to a 4 crew team in 16-21 months. The estimate was compared to the actual source code count of 22300 LOC.
基于PHP和MYSQL的团队规划网站功能点分析
在一个基于PHP和MYSQL的定制团队规划网站上进行了功能点分析(FPA)。FPA是在开发完成后完成的(回顾性),并进行了建设性成本模型分析(COCOMO)以评估源代码行(SLOC)。在本研究中,函数点分析基于关系数据库的实体,这些实体被评估为内部逻辑文件,并评估具有动态SQL的PHP源代码作为外部输入文件或外部查询文件。定制团队规划网站的复杂性为510个总调整功能点(TAFP)(UAF=580 FP,TDI=23,VAF=0,88,TAFP=510 FP)。在COCOMO分析中,函数点估计被归类为一个有机项目,得出的结论是复杂性对应于27742 LOC(或27,4 KDSI)。估计66-82人月的项目将相当于16-21个月的4个船员团队。将估计值与22300 LOC的实际源代码计数进行了比较。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信