The client's essential stakeholder collaboration activities at the front-end phase of a hospital construction project

IF 4.6 Q2 MATERIALS SCIENCE, BIOMATERIALS
Kari-Pekka Tampio, H. Haapasalo, J. Lehtinen
{"title":"The client's essential stakeholder collaboration activities at the front-end phase of a hospital construction project","authors":"Kari-Pekka Tampio, H. Haapasalo, J. Lehtinen","doi":"10.1108/ijmpb-12-2022-0278","DOIUrl":null,"url":null,"abstract":"PurposeThe research problem in this study is how a client (as a project owner) should organise early stakeholder involvement and integration in the front-end phase of a project. This study aims to create normative managerial statements as propositions from the client's perspective and to combine them into a set of activities enabling efficient organisation in the front-end phase of a hospital construction project.Design/methodology/approachAction design research (ADR) was carried out in a large hospital construction project where the first author acted as an “involved researcher” and the other authors acted as “outside researchers”.FindingsThe authors created seven normative managerial propositions that were verified by the case project stakeholders and developed a managerial framework describing the client's essential stakeholder involvement and integration activities in the front-end phase of a hospital construction project based on these propositions. The authors have also depicted the subphases of the front-end phase: value definition phase in the client permanent organisation, value proposition phase in the client Programme Management Office (PMO) and finally development phase in the alliance organisation ending on the final investment decision.Practical implicationsThe collaborative contract delivery model enables the early involvement and integration of stakeholders. It has been somewhat surprising to note the extent to which collaborative contracts change the client role in the project front-end. The results offer practical activities for how clients can manage front-end activities in collaborative contracts.Originality/valueThe case project offered a platform to analyse how the collaborative contract delivery model changes the emphasis of activities in the front-end of a project. One of the key benefits of collaborative contracts is that development, design and delivery occur partially in parallel, thereby enabling contributions from production to be included in the design and development. The benefit of having a real-life case under study provides the possibility to triangulate and analyse rich data, however limited by the qualitative case method.","PeriodicalId":2,"journal":{"name":"ACS Applied Bio Materials","volume":null,"pages":null},"PeriodicalIF":4.6000,"publicationDate":"2023-07-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"ACS Applied Bio Materials","FirstCategoryId":"91","ListUrlMain":"https://doi.org/10.1108/ijmpb-12-2022-0278","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"MATERIALS SCIENCE, BIOMATERIALS","Score":null,"Total":0}
引用次数: 0

Abstract

PurposeThe research problem in this study is how a client (as a project owner) should organise early stakeholder involvement and integration in the front-end phase of a project. This study aims to create normative managerial statements as propositions from the client's perspective and to combine them into a set of activities enabling efficient organisation in the front-end phase of a hospital construction project.Design/methodology/approachAction design research (ADR) was carried out in a large hospital construction project where the first author acted as an “involved researcher” and the other authors acted as “outside researchers”.FindingsThe authors created seven normative managerial propositions that were verified by the case project stakeholders and developed a managerial framework describing the client's essential stakeholder involvement and integration activities in the front-end phase of a hospital construction project based on these propositions. The authors have also depicted the subphases of the front-end phase: value definition phase in the client permanent organisation, value proposition phase in the client Programme Management Office (PMO) and finally development phase in the alliance organisation ending on the final investment decision.Practical implicationsThe collaborative contract delivery model enables the early involvement and integration of stakeholders. It has been somewhat surprising to note the extent to which collaborative contracts change the client role in the project front-end. The results offer practical activities for how clients can manage front-end activities in collaborative contracts.Originality/valueThe case project offered a platform to analyse how the collaborative contract delivery model changes the emphasis of activities in the front-end of a project. One of the key benefits of collaborative contracts is that development, design and delivery occur partially in parallel, thereby enabling contributions from production to be included in the design and development. The benefit of having a real-life case under study provides the possibility to triangulate and analyse rich data, however limited by the qualitative case method.
客户在医院建设项目前端阶段的重要利益相关者协作活动
目的本研究的研究问题是,客户(作为项目所有者)应如何组织项目前端阶段的早期利益相关者参与和整合。本研究旨在从客户的角度创建规范的管理声明作为命题,并将其结合为一系列活动,从而在医院建设项目的前端阶段实现高效组织。设计/方法/方法行动设计研究(ADR)是在一个大型医院建设项目中进行的,第一作者作为“参与研究者”,其他作者作为“外部研究者”。发现作者创建了七个规范性管理主张,这些主张得到了案例项目利益相关者的验证,并基于这些主张制定了一个管理框架,描述了客户在医院建设项目前端阶段的重要利益相关者参与和整合活动。作者还描述了前端阶段的子阶段:客户常设组织的价值定义阶段,客户项目管理办公室(PMO)的价值主张阶段,以及最终以最终投资决策为终点的联盟组织的发展阶段。实际含义协作合同交付模式使利益相关者能够尽早参与和整合。令人惊讶的是,协作合同在多大程度上改变了项目前端的客户角色。研究结果为客户如何管理协作合同中的前端活动提供了实践活动。创意/价值案例项目提供了一个平台,用于分析合作合同交付模式如何改变项目前端活动的重点。合作合同的一个主要好处是,开发、设计和交付部分并行进行,从而使生产贡献能够纳入设计和开发。研究真实案例的好处是可以对丰富的数据进行三角测量和分析,但受到定性案例方法的限制。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
ACS Applied Bio Materials
ACS Applied Bio Materials Chemistry-Chemistry (all)
CiteScore
9.40
自引率
2.10%
发文量
464
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信