Reserves-to-production ratio – on the reliability of estimates

IF 0.8 Q3 ENGINEERING, PETROLEUM
Georesursy Pub Date : 2022-09-30 DOI:10.18599/grs.2022.3.2
Alexander V. Sokolov, A. V. Shubina
{"title":"Reserves-to-production ratio – on the reliability of estimates","authors":"Alexander V. Sokolov, A. V. Shubina","doi":"10.18599/grs.2022.3.2","DOIUrl":null,"url":null,"abstract":"At present, when estimating the state of the resource base and the general forecast for the development of oil production, ones often operate with the reserves-to-production ratio, which reflects, as it is believed, a guaranteed time for involving current recoverable reserves in active development. However, the terms (numbers) differ significantly. In this regard, it seems appropriate to once again discuss the content of the commonly used ratio, the differences in approaches to its estimation and use in Russia and abroad, as well as the possibility of using it when forecasting production and the need for an increase in reserves.","PeriodicalId":43752,"journal":{"name":"Georesursy","volume":null,"pages":null},"PeriodicalIF":0.8000,"publicationDate":"2022-09-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Georesursy","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.18599/grs.2022.3.2","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, PETROLEUM","Score":null,"Total":0}
引用次数: 2

Abstract

At present, when estimating the state of the resource base and the general forecast for the development of oil production, ones often operate with the reserves-to-production ratio, which reflects, as it is believed, a guaranteed time for involving current recoverable reserves in active development. However, the terms (numbers) differ significantly. In this regard, it seems appropriate to once again discuss the content of the commonly used ratio, the differences in approaches to its estimation and use in Russia and abroad, as well as the possibility of using it when forecasting production and the need for an increase in reserves.
储量与产量之比——关于估算的可靠性
目前,在估计资源基础状况和石油生产发展的总体预测时,通常采用储量与产量的比率进行操作,这反映了人们认为,将当前可采储量纳入积极开发的保证时间。然而,术语(数字)差别很大。在这方面,似乎应该再次讨论常用比率的内容、俄罗斯国内外对其估计和使用方法的差异,以及在预测产量时使用该比率的可能性和增加储量的必要性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Georesursy
Georesursy ENGINEERING, PETROLEUM-
CiteScore
1.50
自引率
25.00%
发文量
49
审稿时长
16 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信