The Analysis of Identification and Risk Mitigation in Irrigation Work Contractors

Achmad Zulfikar Armandoko, Ruzardi Ruzardi, Albani Musyafa
{"title":"The Analysis of Identification and Risk Mitigation in Irrigation Work Contractors","authors":"Achmad Zulfikar Armandoko, Ruzardi Ruzardi, Albani Musyafa","doi":"10.15294/jtsp.v25i1.43248","DOIUrl":null,"url":null,"abstract":"Irrigation construction project work is a type of project that has a relatively high risk potential compared to other project work. The development of construction projects in Indonesia can be seen from the use of new methods and technologies as well as the increasing number of parties involved. Rehabilitation of the Progomanggis irrigation network is more complicated than other rehabilitation works because it covers a large area and is located in a place with difficult access. Therefore, this work is vulnerable to the risks that will arise. Based on the results of the analysis carried out, it can be concluded that the schedule for opening and closing river water in the Progomanggis Irrigation Network Rehabilitation Project has a very high risk of project performance. The impact of risk on the project is the delay in work time. Other risks are: weather conditions; changes in work methods; shunt materials; and cropping patterns of water-using communities. Risk control on the project is carried out by conducting regular coordination meetings with stakeholders and making adjustments to work methods.   ","PeriodicalId":31108,"journal":{"name":"Jurnal Teknik Sipil dan Perencanaan","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-04-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Teknik Sipil dan Perencanaan","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.15294/jtsp.v25i1.43248","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Irrigation construction project work is a type of project that has a relatively high risk potential compared to other project work. The development of construction projects in Indonesia can be seen from the use of new methods and technologies as well as the increasing number of parties involved. Rehabilitation of the Progomanggis irrigation network is more complicated than other rehabilitation works because it covers a large area and is located in a place with difficult access. Therefore, this work is vulnerable to the risks that will arise. Based on the results of the analysis carried out, it can be concluded that the schedule for opening and closing river water in the Progomanggis Irrigation Network Rehabilitation Project has a very high risk of project performance. The impact of risk on the project is the delay in work time. Other risks are: weather conditions; changes in work methods; shunt materials; and cropping patterns of water-using communities. Risk control on the project is carried out by conducting regular coordination meetings with stakeholders and making adjustments to work methods.   
灌溉工程承包商的识别与风险缓释分析
与其他项目工作相比,灌溉建设项目工作是一种风险潜力相对较高的项目。印度尼西亚建筑项目的发展可以从新方法和技术的使用以及参与方数量的增加中看出。Progomaggis灌溉网络的修复比其他修复工程更为复杂,因为它占地面积大,而且位于难以进入的地方。因此,这项工作很容易受到即将出现的风险的影响。根据分析结果,可以得出结论,Progomargis灌溉网络修复项目中的河水开放和关闭时间表对项目绩效具有非常高的风险。风险对项目的影响是工作时间的延误。其他风险包括:天气状况;工作方法的改变;分流材料;以及用水社区的种植模式。项目的风险控制是通过定期与利益相关者举行协调会议并调整工作方法来进行的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
21
审稿时长
24 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信