Integrated digital transformation implemented in development of the Gremyachinskoe potassium-magnesium salt deposit

Q4 Engineering
E. M. Sakharov, R. Berger, M. Rylnikova
{"title":"Integrated digital transformation implemented in development of the Gremyachinskoe potassium-magnesium salt deposit","authors":"E. M. Sakharov, R. Berger, M. Rylnikova","doi":"10.30686/1609-9192-2022-5-69-73","DOIUrl":null,"url":null,"abstract":"The paper reviews the main trends in digitalization of the production processes implemented during the development of the Gremyachinskoe potassium-magnesium salt deposit. The main objective of the digital projects is to maintain competitiveness in the current market conditions. When implementing the integrated digital transformation project, the EuroChem-VolgaKaliy created a clear system of criteria to control the efficiency of the business processes and intriduced instrumental control over the actual duration of the technological cycle. Comparing more complete information on personnel with production metrics data creates objective ratings of face teams and foremen, which makes it possible to reduce production cycle time and increase average daily production volumes by 26%. An important area for further implementation of the project will be upgrading the IT-infrastructure, robotization of the office tasks, e.g. automatic generation of production requests, transfer of messages between the related divisions with no manual entry of information. After the information array is formed, it is planned to introduce the dependency analysis of production indicators with definition of equipment breakdown parameters. This will help to reduce the total number of downtime cases and increase the productivity of the mine as a whole, and will ensure a significant reduction in duration of unscheduled emergency repairs. A promising trend in activities of the Gremyachinskoe mining-and-processing integrated works is application of artificial intelligence in planning of mining operations. In order to solve these tasks it is envisaged to create 3D models, to simulate various methods and technologies of mining salt formations, to determine the design parameters of the mining method with account of the actual morphology and thixotropy of the formations.","PeriodicalId":36119,"journal":{"name":"Gornaya Promyshlennost","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-11-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Gornaya Promyshlennost","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30686/1609-9192-2022-5-69-73","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 0

Abstract

The paper reviews the main trends in digitalization of the production processes implemented during the development of the Gremyachinskoe potassium-magnesium salt deposit. The main objective of the digital projects is to maintain competitiveness in the current market conditions. When implementing the integrated digital transformation project, the EuroChem-VolgaKaliy created a clear system of criteria to control the efficiency of the business processes and intriduced instrumental control over the actual duration of the technological cycle. Comparing more complete information on personnel with production metrics data creates objective ratings of face teams and foremen, which makes it possible to reduce production cycle time and increase average daily production volumes by 26%. An important area for further implementation of the project will be upgrading the IT-infrastructure, robotization of the office tasks, e.g. automatic generation of production requests, transfer of messages between the related divisions with no manual entry of information. After the information array is formed, it is planned to introduce the dependency analysis of production indicators with definition of equipment breakdown parameters. This will help to reduce the total number of downtime cases and increase the productivity of the mine as a whole, and will ensure a significant reduction in duration of unscheduled emergency repairs. A promising trend in activities of the Gremyachinskoe mining-and-processing integrated works is application of artificial intelligence in planning of mining operations. In order to solve these tasks it is envisaged to create 3D models, to simulate various methods and technologies of mining salt formations, to determine the design parameters of the mining method with account of the actual morphology and thixotropy of the formations.
Gremyachinskoe钾镁盐矿开发实施一体化数字化改造
本文回顾了Gremyachinskoe钾镁盐矿开发过程中生产流程数字化的主要趋势。数字项目的主要目标是在当前市场条件下保持竞争力。在实施综合数字化转型项目时,EuroChem VolgaKaliy创建了一个明确的标准体系来控制业务流程的效率,并引入了对技术周期实际持续时间的工具控制。将更完整的人员信息与生产指标数据进行比较,可以对工作面团队和工头进行客观评级,从而可以缩短生产周期,并将日均产量提高26%。进一步实施该项目的一个重要领域将是升级信息技术基础设施,实现办公任务的自动化,例如自动生成生产请求,在相关部门之间传递信息,而无需手动输入信息。信息阵列形成后,计划引入生产指标的相关性分析,并定义设备故障参数。这将有助于减少停工总次数,提高整个矿山的生产力,并确保大幅缩短计划外紧急维修的持续时间。Gremyachinskoe采矿和加工综合工程活动的一个有希望的趋势是将人工智能应用于采矿作业计划。为了解决这些任务,设想创建3D模型,模拟开采盐层的各种方法和技术,根据地层的实际形态和触变性确定开采方法的设计参数。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Gornaya Promyshlennost
Gornaya Promyshlennost Engineering-Industrial and Manufacturing Engineering
CiteScore
1.10
自引率
0.00%
发文量
100
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信