{"title":"Go over the mountain and overcome the challenges to power the city","authors":"A. Ip, Victor K. Shum, Leo K P Fung","doi":"10.1080/1023697X.2018.1462103","DOIUrl":null,"url":null,"abstract":"ABSTRACT To cope with future electricity demand and upgrade power system stability against extreme weather, CLP Power Hong Kong Limited (CLP Power) has developed a new 400kV overhead line circuit. The project involved building a new gantry situated on a natural steep slope, which natural terrain hazards including open hillslope failure, rockfall needed to be addressed. This technical note discussed the technical considerations and challenges to cater for the geological settings, methodologies applied in the geological assessment from desktop studies, site reconnaissance, natural terrain hazard assessment, mitigation measures, foundation design, and the use of Building Information Model (BIM) to enhance project planning and development.","PeriodicalId":35587,"journal":{"name":"Transactions Hong Kong Institution of Engineers","volume":"25 1","pages":"145 - 151"},"PeriodicalIF":0.0000,"publicationDate":"2018-04-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1080/1023697X.2018.1462103","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Transactions Hong Kong Institution of Engineers","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/1023697X.2018.1462103","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 0

Abstract

ABSTRACT To cope with future electricity demand and upgrade power system stability against extreme weather, CLP Power Hong Kong Limited (CLP Power) has developed a new 400kV overhead line circuit. The project involved building a new gantry situated on a natural steep slope, which natural terrain hazards including open hillslope failure, rockfall needed to be addressed. This technical note discussed the technical considerations and challenges to cater for the geological settings, methodologies applied in the geological assessment from desktop studies, site reconnaissance, natural terrain hazard assessment, mitigation measures, foundation design, and the use of Building Information Model (BIM) to enhance project planning and development.
翻越高山,克服挑战,为城市提供动力
为应付未来电力需求及提升电力系统在极端天气下的稳定性,中华电力有限公司(下称“中电”)开发了一条新的400kV架空线路。该项目涉及在天然陡坡上建造一个新的龙门,需要解决自然地形危险,包括开阔的山坡破坏,落石。本技术简报讨论因应地质环境的技术考虑和挑战、在桌面研究、地盘勘测、自然地形灾害评估、缓解措施、基础设计等地质评估中应用的方法,以及使用建筑资讯模型(BIM)加强项目规划和发展。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Transactions Hong Kong Institution of Engineers
Transactions Hong Kong Institution of Engineers Engineering-Engineering (all)
CiteScore
2.70
自引率
0.00%
发文量
22
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信