Piping Potential due to springs in dam (Case study : Titab Dam)

I. P. H. Anggara, Sri Sangkawati Sachro, T. Putranto
{"title":"Piping Potential due to springs in dam (Case study : Titab Dam)","authors":"I. P. H. Anggara, Sri Sangkawati Sachro, T. Putranto","doi":"10.14710/mkts.v27i2.40192","DOIUrl":null,"url":null,"abstract":"The dam is one of the water infrastructures that can function as conservation, utilization, and control of thedestructive power of water. Titab Dam is one of the dams in Indonesia that has multifunction as irrigationwater, raw water and hydropower. This dam is a type of rock fill dam with an upright core which has a peaklength of 210 m, a width of 12 m, and a height of 78 m from the deepest foundation. This dam was built withrelatively complex geological conditions and landslides occurred on the spillway walls and springs were foundin the landslides so it was necessary to analyze the potential for piping due to the presence of springs. Thisstudy examines the potential for piping due to the influence of springs near the dam. The study was conductedbased on instrument observations during the inundation period from 2016 to 2019. The analysis was carriedout by calculating the acceptance criteria (KP) for seepage and seepage index (Qi) to determine seepagebehavior in the dam body and a safety factor analysis (FK) for piping hazards was carried out by comparingthe hydraulic gradient based on piezometer instrumentation readings and the hydraulic gradient of the dambody core material. Based on the calculation of the seepage acceptance criteria and the seepage index, theseepage that occurs in the Titab Dam is not safe because it exceeds the requirements, the average seepageoccurs is 6.350 > 0.56 liter/minute/m and Qi > 1. However, the analysis of the safety factor of piping hazardis still safe that is equal to 8,390 > 4.","PeriodicalId":31880,"journal":{"name":"Media Komunikasi Teknik Sipil","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-12-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Media Komunikasi Teknik Sipil","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.14710/mkts.v27i2.40192","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The dam is one of the water infrastructures that can function as conservation, utilization, and control of thedestructive power of water. Titab Dam is one of the dams in Indonesia that has multifunction as irrigationwater, raw water and hydropower. This dam is a type of rock fill dam with an upright core which has a peaklength of 210 m, a width of 12 m, and a height of 78 m from the deepest foundation. This dam was built withrelatively complex geological conditions and landslides occurred on the spillway walls and springs were foundin the landslides so it was necessary to analyze the potential for piping due to the presence of springs. Thisstudy examines the potential for piping due to the influence of springs near the dam. The study was conductedbased on instrument observations during the inundation period from 2016 to 2019. The analysis was carriedout by calculating the acceptance criteria (KP) for seepage and seepage index (Qi) to determine seepagebehavior in the dam body and a safety factor analysis (FK) for piping hazards was carried out by comparingthe hydraulic gradient based on piezometer instrumentation readings and the hydraulic gradient of the dambody core material. Based on the calculation of the seepage acceptance criteria and the seepage index, theseepage that occurs in the Titab Dam is not safe because it exceeds the requirements, the average seepageoccurs is 6.350 > 0.56 liter/minute/m and Qi > 1. However, the analysis of the safety factor of piping hazardis still safe that is equal to 8,390 > 4.
大坝弹簧引起的管道电位(以Titab大坝为例)
大坝是水利基础设施之一,可以起到保护、利用和控制水的破坏力的作用。蒂塔布大坝是印度尼西亚的一座大坝,具有灌溉水、原水和水电等多种功能。该大坝是一种直立心墙堆石坝,其峰值长度为210 m,宽度为12 m,距离最深基础的高度为78 m。该大坝是在地质条件相对复杂的情况下建造的,溢洪道壁上发生了滑坡,滑坡中发现了弹簧,因此有必要分析由于弹簧的存在而产生管道的可能性。这项研究考察了由于大坝附近泉水的影响而产生管道的可能性。该研究是根据2016年至2019年淹没期间的仪器观测结果进行的。通过计算渗透验收标准(KP)和渗透指数(Qi)来确定坝体的渗透行为,并通过比较基于测压计仪器读数的水力梯度和坝体芯材的水力梯度来进行管道危险的安全系数分析(FK)。根据渗透验收标准和渗透指数的计算,Titab大坝出现的渗漏是不安全的,因为它超过了要求,平均渗漏量为6.350>0.56升/分钟/m,Qi>1。然而,管道危险的安全系数分析仍然是安全的,等于8390>4。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
审稿时长
8 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书