Project cost performance factors in the war-affected and conflict-sensitive Afghan construction industry

IF 2.6 Q1 ENGINEERING, MULTIDISCIPLINARY
Ahmad Shah Kakar, A. Hasan, K. N. Jha, Amarjit Singh
{"title":"Project cost performance factors in the war-affected and conflict-sensitive Afghan construction industry","authors":"Ahmad Shah Kakar, A. Hasan, K. N. Jha, Amarjit Singh","doi":"10.1108/jedt-11-2021-0657","DOIUrl":null,"url":null,"abstract":"\nPurpose\nThe Afghan construction industry faces resource shortages and heavily relies on foreign aid to fund public projects on the path to recovery and reconstruction. While the resource constraints demand cost-efficient delivery of construction projects, many Afghan public projects experience delays and cost overruns. This study aims to evaluate various attributes and factors influencing cost performance in public construction projects in Afghanistan.\n\n\nDesign/methodology/approach\nThe literature review and Delphi method identified 30 cost performance attributes relevant to the context of Afghanistan. Next, a questionnaire survey was conducted with construction management professionals working in the public sector in the Afghan construction industry to evaluate these attributes.\n\n\nFindings\nThis study found that the lack of resources, poor project management skills and corruption in procurement are the leading causes behind cost overruns in Afghan public projects. This study also identified five latent factors influencing cost performance in public projects in Afghanistan: competency of the project team, socioeconomic and political support, governance and public procurement, planning and risk management and project characteristics.\n\n\nResearch limitations/implications\nThe exploratory factor analysis did not reveal the relative significance of different cost performance success factors. Moreover, the ranking of cost performance attributes is based on the responses from the public sector construction professionals only.\n\n\nPractical implications\nThe construction industry in Afghanistan significantly contributes to the country’s social and economic growth and employment. This study’s findings will help researchers, project sponsors, government departments and industry practitioners interested in improving the cost performance in Afghan public projects.\n\n\nOriginality/value\nGiven the scarcity of research in war-affected and conflict-sensitive regions, this study fills a research gap on project cost performance by providing insights into the cost performance success factors in public projects in Afghanistan.\n","PeriodicalId":46533,"journal":{"name":"Journal of Engineering Design and Technology","volume":" ","pages":""},"PeriodicalIF":2.6000,"publicationDate":"2022-11-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Engineering Design and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/jedt-11-2021-0657","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"ENGINEERING, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 0

Abstract

Purpose The Afghan construction industry faces resource shortages and heavily relies on foreign aid to fund public projects on the path to recovery and reconstruction. While the resource constraints demand cost-efficient delivery of construction projects, many Afghan public projects experience delays and cost overruns. This study aims to evaluate various attributes and factors influencing cost performance in public construction projects in Afghanistan. Design/methodology/approach The literature review and Delphi method identified 30 cost performance attributes relevant to the context of Afghanistan. Next, a questionnaire survey was conducted with construction management professionals working in the public sector in the Afghan construction industry to evaluate these attributes. Findings This study found that the lack of resources, poor project management skills and corruption in procurement are the leading causes behind cost overruns in Afghan public projects. This study also identified five latent factors influencing cost performance in public projects in Afghanistan: competency of the project team, socioeconomic and political support, governance and public procurement, planning and risk management and project characteristics. Research limitations/implications The exploratory factor analysis did not reveal the relative significance of different cost performance success factors. Moreover, the ranking of cost performance attributes is based on the responses from the public sector construction professionals only. Practical implications The construction industry in Afghanistan significantly contributes to the country’s social and economic growth and employment. This study’s findings will help researchers, project sponsors, government departments and industry practitioners interested in improving the cost performance in Afghan public projects. Originality/value Given the scarcity of research in war-affected and conflict-sensitive regions, this study fills a research gap on project cost performance by providing insights into the cost performance success factors in public projects in Afghanistan.
受战争影响和冲突敏感的阿富汗建筑业的项目成本绩效因素
阿富汗建筑业面临资源短缺,严重依赖外国援助为恢复和重建道路上的公共项目提供资金。虽然资源限制要求以成本效益高的方式交付建筑项目,但许多阿富汗公共项目却出现延误和成本超支的情况。本研究旨在评估影响阿富汗公共建设项目成本绩效的各种属性和因素。设计/方法/方法文献回顾和德尔菲法确定了与阿富汗背景相关的30个成本绩效属性。接下来,对在阿富汗建筑业公共部门工作的建筑管理专业人员进行了问卷调查,以评估这些属性。这项研究发现,资源缺乏、项目管理技能差和采购腐败是阿富汗公共项目成本超支的主要原因。本研究还确定了影响阿富汗公共项目成本绩效的五个潜在因素:项目团队的能力、社会经济和政治支持、治理和公共采购、规划和风险管理以及项目特点。研究局限性/启示探索性因子分析并未揭示不同性价比成功因素的相对显著性。此外,性价比属性的排名仅基于公共部门建筑专业人员的回应。实际意义阿富汗的建筑业对该国的社会和经济增长以及就业做出了重大贡献。这项研究的结果将有助于研究人员、项目发起人、政府部门和对提高阿富汗公共项目的性价比感兴趣的行业从业者。原创性/价值鉴于在受战争影响和冲突敏感地区的研究缺乏,本研究通过深入了解阿富汗公共项目的成本绩效成功因素,填补了项目成本绩效的研究空白。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Journal of Engineering Design and Technology
Journal of Engineering Design and Technology ENGINEERING, MULTIDISCIPLINARY-
CiteScore
6.50
自引率
21.40%
发文量
67
期刊介绍: - Design strategies - Usability and adaptability - Material, component and systems performance - Process control - Alternative and new technologies - Organizational, management and research issues - Human factors - Environmental, quality and health and safety issues - Cost and life cycle issues - Sustainability criteria, indicators, measurement and practices - Risk management - Entrepreneurship Law, regulation and governance - Design, implementing, managing and practicing innovation - Visualization, simulation, information and communication technologies - Education practices, innovation, strategies and policy issues.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信