Design of panel and support system for extraction of inclined thick coal seam using numerical modelling

Q3 Engineering
Sreenivasa Rao Islavath, Sujeet Bharti
{"title":"Design of panel and support system for extraction of inclined thick coal seam using numerical modelling","authors":"Sreenivasa Rao Islavath, Sujeet Bharti","doi":"10.1504/ijmme.2021.10040110","DOIUrl":null,"url":null,"abstract":"The depillaring operation develops high stress concentration in the workings and poses many strata control issues such as roof convergence, floor heaving, side spalling and pillar/ribs crushing. A detailed stability analysis need to be conducted to control these strata issues and estimate the optimum coal panel size and support system. In this paper, the stability analysis of the panel and design of the support system are presented for safe winning of inclined coal seam using 2D and 3D numerical modelling approach. The panel is developed by rhombus pillars of 25 m × 25 m size with 4.2 m and 4.8 m wide galleries and being proposed for depillaring. 3D and 2D numerical models are used to analyse the development of stresses during depillaring operation and determine the working conditions respectively. This study suggests the suitable pillar size, gallery width, mining height and the required support resistance.","PeriodicalId":38622,"journal":{"name":"International Journal of Mining and Mineral Engineering","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-08-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Mining and Mineral Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1504/ijmme.2021.10040110","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 1

Abstract

The depillaring operation develops high stress concentration in the workings and poses many strata control issues such as roof convergence, floor heaving, side spalling and pillar/ribs crushing. A detailed stability analysis need to be conducted to control these strata issues and estimate the optimum coal panel size and support system. In this paper, the stability analysis of the panel and design of the support system are presented for safe winning of inclined coal seam using 2D and 3D numerical modelling approach. The panel is developed by rhombus pillars of 25 m × 25 m size with 4.2 m and 4.8 m wide galleries and being proposed for depillaring. 3D and 2D numerical models are used to analyse the development of stresses during depillaring operation and determine the working conditions respectively. This study suggests the suitable pillar size, gallery width, mining height and the required support resistance.
用数值模拟方法设计倾斜厚煤层开采盘及支护系统
脱柱作业在工作中产生了高应力集中,并带来了许多地层控制问题,如顶板收敛、底板隆起、侧剥落和柱/肋破碎。需要进行详细的稳定性分析,以控制这些地层问题,并估计最佳的煤板尺寸和支护系统。本文采用二维和三维数值模拟方法,对倾斜煤层安全回采底板稳定性分析和支护系统设计进行了研究。面板由尺寸为25米× 25米的菱形柱子组成,有4.2米和4.8米宽的廊道,并建议用于脱柱。采用三维和二维数值模型分别分析了脱柱过程中的应力变化规律,确定了脱柱过程中的工作条件。研究提出了适宜的矿柱尺寸、巷道宽度、开采高度和所需的支护阻力。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
International Journal of Mining and Mineral Engineering
International Journal of Mining and Mineral Engineering Engineering-Industrial and Manufacturing Engineering
CiteScore
1.90
自引率
0.00%
发文量
1
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信