{"title":"Sensitivity analysis of the contractor’s financial effects achieved on a single building site","authors":"H. Anysz, W. Rogala","doi":"10.22630/PNIKS.2019.28.2.17","DOIUrl":null,"url":null,"abstract":"Based on catalogues, the time schedule of erecting multi-storey building has been prepared. Real current conditions and the average cost of the building allows for creating the model where four variables influence NPV and maximum cash demand of a contractor erecting the building. The simulation made in the spreadsheet is the base for calculating and presenting the sensitivity analysis of each variable separately, as well as, for creating the surface chart where the joint influence of terms of payments affects the maximum demand for cash. The way of using of this chart has been described aiming at the protection of the contractor from losing financial liquidity while the profi table project is executed.","PeriodicalId":38397,"journal":{"name":"Scientific Review Engineering and Environmental Sciences","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-07-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Scientific Review Engineering and Environmental Sciences","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.22630/PNIKS.2019.28.2.17","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Earth and Planetary Sciences","Score":null,"Total":0}
引用次数: 5
Abstract
Based on catalogues, the time schedule of erecting multi-storey building has been prepared. Real current conditions and the average cost of the building allows for creating the model where four variables influence NPV and maximum cash demand of a contractor erecting the building. The simulation made in the spreadsheet is the base for calculating and presenting the sensitivity analysis of each variable separately, as well as, for creating the surface chart where the joint influence of terms of payments affects the maximum demand for cash. The way of using of this chart has been described aiming at the protection of the contractor from losing financial liquidity while the profi table project is executed.
期刊介绍:
Scientific Review Engineering and Environmental Sciences [Przegląd Naukowy Inżynieria i Kształtowanie Środowiska] covers broad area of knowledge and practice on fields such as: sustainable development, landscaping of non-urbanized lands, environmental engineering, construction projects engineering land management, protection and land reclamation, environmental impact of investments, ecology, hydrology and water management, ground-water monitoring and restoration, geotechnical engineering, meteorology and connecting subjects. Authors are welcome to submit theoretical and practice-oriented papers containing detailed case studies within above mentioned disciplines. However, theoretical papers should contain part with practical application of the theory presented. Papers (in Polish or English languages) are accepted for publication after obtaining positive opinions of two reviewers. Papers published elsewhere are not accepted.