{"title":"PENINGKATAN EFISIENSI BIAYA PEMBANGUNAN GEDUNG BERTINGKAT DENGAN APLIKASI BUILDING INFORMATION MODELING (BIM) 5D","authors":"Faqih Nadiya Umam, Erizal Erizal, H. Putra","doi":"10.29103/tj.v12i1.704","DOIUrl":null,"url":null,"abstract":"Most construction companies in Indonesia currently still use conventional applications that are carried out separately. The consequences that are often found from the use of fragmented conventional applications include construction waste and delays in the information that cause cost and time inefficiencies. Therefore, an integrated system is needed to answer these problems. One technology that has emerged to answer these problems is Building Information Modeling (BIM). This research was conducted by modeling simulations and calculations to evaluate the accuracy and cost-efficiency of using the BIM 5D application compared to conventional methods in rebar and concrete work. The project simulation was carried out on a 16-floor apartment. As a result, the use of the BIM 5D application can reduce labor costs by Rp171,989,939.00 or save 6.33%. The efficiency values of fc'30 MPa concrete work, fc'35 MPa concrete, and rebar work are 7.21%, 10.87%, and 5.98%, respectively. The total cost-efficiency obtained is Rp406,697,000.00. This cost is huge compared to the investment cost of the BIM 5D application for Rp127,000,000.00.","PeriodicalId":52898,"journal":{"name":"Teras Jurnal Jurnal Teknik Sipil","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-04-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Teras Jurnal Jurnal Teknik Sipil","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29103/tj.v12i1.704","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
Most construction companies in Indonesia currently still use conventional applications that are carried out separately. The consequences that are often found from the use of fragmented conventional applications include construction waste and delays in the information that cause cost and time inefficiencies. Therefore, an integrated system is needed to answer these problems. One technology that has emerged to answer these problems is Building Information Modeling (BIM). This research was conducted by modeling simulations and calculations to evaluate the accuracy and cost-efficiency of using the BIM 5D application compared to conventional methods in rebar and concrete work. The project simulation was carried out on a 16-floor apartment. As a result, the use of the BIM 5D application can reduce labor costs by Rp171,989,939.00 or save 6.33%. The efficiency values of fc'30 MPa concrete work, fc'35 MPa concrete, and rebar work are 7.21%, 10.87%, and 5.98%, respectively. The total cost-efficiency obtained is Rp406,697,000.00. This cost is huge compared to the investment cost of the BIM 5D application for Rp127,000,000.00.