A study on relationship of duct leakage and parameters of ducts in Quang Ninh mine

IF 0.4 Q4 MINING & MINERAL PROCESSING
Thao Dang Phuong, Chi Dang Vu
{"title":"A study on relationship of duct leakage and parameters of ducts in Quang Ninh mine","authors":"Thao Dang Phuong, Chi Dang Vu","doi":"10.29227/im-2019-02-72","DOIUrl":null,"url":null,"abstract":"Air leakage of auxiliary ventilation ducting systems is the most commonreason for the insufficient fresh air in the working face in underground mine.This value is important design parameter for mine auxiliary ventilationsystem that operates more effectively, with lower cost.Therefore, determination of air leakage along auxiliary ventilation ductingsystems has been examined. Also, factors which affect air leakage in theducting system have been investigated. Experimental data are made on 0.7m and 1 m diameter ducts over sections of ducts installing towards theworking face in Quang Ninh mine.","PeriodicalId":44414,"journal":{"name":"Inzynieria Mineralna-Journal of the Polish Mineral Engineering Society","volume":null,"pages":null},"PeriodicalIF":0.4000,"publicationDate":"2022-01-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Inzynieria Mineralna-Journal of the Polish Mineral Engineering Society","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29227/im-2019-02-72","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"MINING & MINERAL PROCESSING","Score":null,"Total":0}
引用次数: 2

Abstract

Air leakage of auxiliary ventilation ducting systems is the most commonreason for the insufficient fresh air in the working face in underground mine.This value is important design parameter for mine auxiliary ventilationsystem that operates more effectively, with lower cost.Therefore, determination of air leakage along auxiliary ventilation ductingsystems has been examined. Also, factors which affect air leakage in theducting system have been investigated. Experimental data are made on 0.7m and 1 m diameter ducts over sections of ducts installing towards theworking face in Quang Ninh mine.
广宁矿管道泄漏与管道参数关系的研究
辅助通风管道系统漏风是井下矿井工作面新风不足最常见的原因。该值是矿井辅助通风系统提高运行效率、降低成本的重要设计参数。因此,对辅助通风管道系统漏风的测定进行了研究。并对影响导风系统漏风的因素进行了研究。在广宁矿面向工作面安装的管道上,对直径为0.7m和1 m的管道进行了实验数据。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
0.70
自引率
0.00%
发文量
44
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信