{"title":"Solution algorithms to minimise the total family tardiness for job shop scheduling with job families","authors":"Jae-Min Yu, Dong Ho Lee","doi":"10.1504/EJIE.2018.089876","DOIUrl":null,"url":null,"abstract":"This study addresses a job shop scheduling problem in which jobs are grouped into job families, but they are processed individually using their distinct routings. Unlike the previous studies, we consider a due-date-based objective of minimising the total family tardiness, i.e., sum of positive deviations between the due-dates and the completion times of job families. A mixed integer programming model is developed to represent the problem mathematically. Then, an optimal algorithm is proposed using the branch and bound technique while developing a job family-based lower bound. For practical applications up to large sized instances, two types of heuristics, modified shifting bottleneck and priority scheduling algorithms, are also proposed. To test the performances of the three types of solution algorithms, computational experiments were done on a number of test instances and the results are reported. [Received: 10 September 2016; Revised: 28 February 2017; Revised: 6 June 2017; Accepted: 22 August 2017]","PeriodicalId":51047,"journal":{"name":"European Journal of Industrial Engineering","volume":"12 1","pages":"1-23"},"PeriodicalIF":1.9000,"publicationDate":"2018-02-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1504/EJIE.2018.089876","citationCount":"5","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"European Journal of Industrial Engineering","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1504/EJIE.2018.089876","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 5
Abstract
This study addresses a job shop scheduling problem in which jobs are grouped into job families, but they are processed individually using their distinct routings. Unlike the previous studies, we consider a due-date-based objective of minimising the total family tardiness, i.e., sum of positive deviations between the due-dates and the completion times of job families. A mixed integer programming model is developed to represent the problem mathematically. Then, an optimal algorithm is proposed using the branch and bound technique while developing a job family-based lower bound. For practical applications up to large sized instances, two types of heuristics, modified shifting bottleneck and priority scheduling algorithms, are also proposed. To test the performances of the three types of solution algorithms, computational experiments were done on a number of test instances and the results are reported. [Received: 10 September 2016; Revised: 28 February 2017; Revised: 6 June 2017; Accepted: 22 August 2017]
期刊介绍:
EJIE is an international journal aimed at disseminating the latest developments in all areas of industrial engineering, including information and service industries, ergonomics and safety, quality management as well as business and strategy, and at bridging the gap between theory and practice.