Study on the ideal location of a bottom drainage roadway

IF 0.9 4区 材料科学 Q3 Materials Science
H. Chen, F. An, Z. Wang, X. Chen
{"title":"Study on the ideal location of a bottom drainage roadway","authors":"H. Chen, F. An, Z. Wang, X. Chen","doi":"10.17159/2411-9717/1561/2022","DOIUrl":null,"url":null,"abstract":"The bottom drainage roadway plays a crucial role in preventing coal and gas outbursts by using underground gas drainage methods. Therefore, it is essential to select the ideal position of the bottom drainage roadway. In this paper use a combination of geological data and numerical simulation to study the ideal position of the bottom drainage roadway, we taking the gas drainage of the first workface of No. 3 coal seam in the Yuxi coal mine in China as an example. The geological study showed a limestone marker layer at an average vertical distance of 14 m from the first mining face. Using this marker layer, the bottom drainage roadway could be excavated without the risk of accidentally exposing the coal seam, and less crosscutting borehole drilling from the bottom drainage roadway would be required. Based on the needs of gas control, the layout of the bottom drainage roadway was selected as an external stagger type. Combined with the numerical simulation results, when located 20 m outside of the mining workface 'footprint' on the horizontal projection, the bottom drainage roadway was a sufficient distance from the stress concentration area during mining of workface 1301, which facilitated roadway maintenance. Furthermore, the length of the crosscutting boreholes is also relatively short, which reduces the amount and cost of drilling. The results of this study are expected to provide a reference for the selection of an ideal position of the bottom drainage roadway in field engineering.","PeriodicalId":17492,"journal":{"name":"Journal of The South African Institute of Mining and Metallurgy","volume":" ","pages":""},"PeriodicalIF":0.9000,"publicationDate":"2022-06-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of The South African Institute of Mining and Metallurgy","FirstCategoryId":"88","ListUrlMain":"https://doi.org/10.17159/2411-9717/1561/2022","RegionNum":4,"RegionCategory":"材料科学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Materials Science","Score":null,"Total":0}
引用次数: 1

Abstract

The bottom drainage roadway plays a crucial role in preventing coal and gas outbursts by using underground gas drainage methods. Therefore, it is essential to select the ideal position of the bottom drainage roadway. In this paper use a combination of geological data and numerical simulation to study the ideal position of the bottom drainage roadway, we taking the gas drainage of the first workface of No. 3 coal seam in the Yuxi coal mine in China as an example. The geological study showed a limestone marker layer at an average vertical distance of 14 m from the first mining face. Using this marker layer, the bottom drainage roadway could be excavated without the risk of accidentally exposing the coal seam, and less crosscutting borehole drilling from the bottom drainage roadway would be required. Based on the needs of gas control, the layout of the bottom drainage roadway was selected as an external stagger type. Combined with the numerical simulation results, when located 20 m outside of the mining workface 'footprint' on the horizontal projection, the bottom drainage roadway was a sufficient distance from the stress concentration area during mining of workface 1301, which facilitated roadway maintenance. Furthermore, the length of the crosscutting boreholes is also relatively short, which reduces the amount and cost of drilling. The results of this study are expected to provide a reference for the selection of an ideal position of the bottom drainage roadway in field engineering.
底部排水巷道的理想位置研究
底部排水巷道在利用地下瓦斯抽放方法预防煤与瓦斯突出方面发挥着至关重要的作用。因此,选择底部排水巷道的理想位置至关重要。本文以玉溪煤矿3号煤层第一工作面瓦斯抽放为例,采用地质资料和数值模拟相结合的方法,研究了底部抽放巷道的理想位置。地质研究显示,石灰岩标志层距离第一个工作面平均垂直距离为14米。使用该标志层,底部排水巷道可以在没有意外暴露煤层的风险的情况下进行开挖,并且需要从底部排水巷道进行较少的横切钻孔钻探。根据瓦斯治理的需要,选择底部排水巷道为外部交错式布置。结合数值模拟结果,当位于水平投影上采矿工作面“足迹”外20 m时,底部排水巷道在工作面1301的采矿过程中与应力集中区有足够的距离,这有助于巷道维护。此外,横切钻孔的长度也相对较短,这减少了钻孔的数量和成本。该研究结果有望为现场工程中底部排水巷道的理想位置选择提供参考。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
1.50
自引率
11.10%
发文量
61
审稿时长
4-8 weeks
期刊介绍: The Journal serves as a medium for the publication of high quality scientific papers. This requires that the papers that are submitted for publication are properly and fairly refereed and edited. This process will maintain the high quality of the presentation of the paper and ensure that the technical content is in line with the accepted norms of scientific integrity.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信