DETERMINATION OF EVALUATION INDICATORS FOR PRE-ABANDONED PROJECT BASED ON SUSTAINABLE GOAL DEVELOPMENT ASPIRATION

Q4 Earth and Planetary Sciences
S. Abdullah, A. Nor Anuar, M. F. Md. Din, S. Mat-Taib
{"title":"DETERMINATION OF EVALUATION INDICATORS FOR PRE-ABANDONED PROJECT BASED ON SUSTAINABLE GOAL DEVELOPMENT ASPIRATION","authors":"S. Abdullah, A. Nor Anuar, M. F. Md. Din, S. Mat-Taib","doi":"10.11113/aej.v12.17428","DOIUrl":null,"url":null,"abstract":"Every project management will strive to ensure that one project can operate without any problems. Unfortunately, some projects are still abandoned due to certain reasons. If the abandonment occurs, the requirement to submit an abandonment plan is stipulated on the Environmental Impact Assessment (EIA) Guideline in Malaysia, 2016. Unfortunately, still lack of resources on pre-project abandonment guidelines which will lead to poor project abandonment report preparation and assessment. Thus, this study aims to determine crucial indicators for assessing the pre-abandoned project, proposing a framework of Malaysia Guidelines for Pre- Project Abandonment Plan (PAP), and validating the draft of the Malaysia Guidelines Framework for PAP. The collected data was compiled from various sources, including document review, survey, and Delphi Method (focus group discussion). The survey conducted proved that the most crucial indicators for the assessment of pre-abandoned project were (i) waste management, (ii) allocation of environmental budgeting, (iii) inventory of scheduled waste, (iv) slurry management, (v) method of demolished, (vi) safety and health of workers, (vii)drainage management system, (viii) site management, (ix) type of treatment plant, and (x) site housekeeping. This framework will assist both report preparer and policymakers on project abandonment report preparation and evaluation, respectively. The development of this framework was strengthened by comprising related legislations, and each indicator synchronized towards Sustainable Development Goal (SDG) 2030.","PeriodicalId":36749,"journal":{"name":"ASEAN Engineering Journal","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-11-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"ASEAN Engineering Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.11113/aej.v12.17428","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Earth and Planetary Sciences","Score":null,"Total":0}
引用次数: 0

Abstract

Every project management will strive to ensure that one project can operate without any problems. Unfortunately, some projects are still abandoned due to certain reasons. If the abandonment occurs, the requirement to submit an abandonment plan is stipulated on the Environmental Impact Assessment (EIA) Guideline in Malaysia, 2016. Unfortunately, still lack of resources on pre-project abandonment guidelines which will lead to poor project abandonment report preparation and assessment. Thus, this study aims to determine crucial indicators for assessing the pre-abandoned project, proposing a framework of Malaysia Guidelines for Pre- Project Abandonment Plan (PAP), and validating the draft of the Malaysia Guidelines Framework for PAP. The collected data was compiled from various sources, including document review, survey, and Delphi Method (focus group discussion). The survey conducted proved that the most crucial indicators for the assessment of pre-abandoned project were (i) waste management, (ii) allocation of environmental budgeting, (iii) inventory of scheduled waste, (iv) slurry management, (v) method of demolished, (vi) safety and health of workers, (vii)drainage management system, (viii) site management, (ix) type of treatment plant, and (x) site housekeeping. This framework will assist both report preparer and policymakers on project abandonment report preparation and evaluation, respectively. The development of this framework was strengthened by comprising related legislations, and each indicator synchronized towards Sustainable Development Goal (SDG) 2030.
基于可持续发展目标的预弃项目评价指标的确定
每一个项目管理层都将努力确保一个项目能够顺利运行。不幸的是,由于某些原因,一些项目仍然被放弃。如果发生废弃,马来西亚环境影响评估(EIA)指南(2016年)规定了提交废弃计划的要求。不幸的是,项目放弃前指导方针仍然缺乏资源,这将导致项目放弃报告的编制和评估不力。因此,本研究旨在确定评估预废弃项目的关键指标,提出马来西亚项目前废弃计划指南(PAP)框架,并验证马来西亚项目前计划指南框架草案。收集的数据来自各种来源,包括文件审查、调查和德尔菲方法(焦点小组讨论)。所进行的调查证明,评估预废弃项目的最关键指标是:(i)废物管理,(ii)环境预算分配,(iii)计划废物清单,(iv)泥浆管理,(v)拆除方法,(vi)工人的安全和健康,(vii)排水管理系统,(viii)现场管理,(ix)处理厂类型,以及(x)现场内务管理。该框架将分别协助报告编制者和决策者编制和评估项目放弃报告。该框架的制定通过纳入相关立法得到了加强,每个指标都与2030年可持续发展目标同步。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
ASEAN Engineering Journal
ASEAN Engineering Journal Engineering-Engineering (all)
CiteScore
0.60
自引率
0.00%
发文量
75
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信