{"title":"ANALISIS PERBAIKAN PROSES PRODUKSI PADA PT SUMBER TEKNIK SENTOSA","authors":"Damar Suryo Bowo","doi":"10.22219/jmb.v8i1.7049","DOIUrl":null,"url":null,"abstract":"This study aimed to analyze the production process of Dies Forging Piston Wheel Cylinder and to suggest the improvement for the production. The data were analyzed by Time-Function Mapping, Cause and Effect, and Failure Mode and Effect Analysis (FMEA). The findings showed that there were seven production phases of Dies Forging Piston Wheel Cylinder. After figuring out the troubled phase, the next step was searching for the cause and the solution of the problem using FMEA. The FMEA calculation indicated 4 problems i.e. the employees working on another product, vibrating clamp machines, employees producing jig, and unavailability of jig. The main problem was detected based on the highest score of Risk Priority Number (RPN) that calculation indicator was severity, occurrence, and detection. ","PeriodicalId":33544,"journal":{"name":"Manajemen Bisnis","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-01-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Manajemen Bisnis","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.22219/jmb.v8i1.7049","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

This study aimed to analyze the production process of Dies Forging Piston Wheel Cylinder and to suggest the improvement for the production. The data were analyzed by Time-Function Mapping, Cause and Effect, and Failure Mode and Effect Analysis (FMEA). The findings showed that there were seven production phases of Dies Forging Piston Wheel Cylinder. After figuring out the troubled phase, the next step was searching for the cause and the solution of the problem using FMEA. The FMEA calculation indicated 4 problems i.e. the employees working on another product, vibrating clamp machines, employees producing jig, and unavailability of jig. The main problem was detected based on the highest score of Risk Priority Number (RPN) that calculation indicator was severity, occurrence, and detection. 
PT-SUMMARY-technology-SENTOSA工艺改进分析
对活塞轮缸模锻模具的生产工艺进行分析,提出改进措施。通过时间函数映射、因果关系和故障模式与影响分析(FMEA)对数据进行分析。研究结果表明,活塞轮缸模锻共有七个生产阶段。在找出问题阶段后,下一步是使用FMEA寻找问题的原因和解决方案。FMEA计算表明了4个问题,即在另一种产品上工作的员工、振动夹具机、生产夹具的员工和夹具不可用。主要问题是根据风险优先数(RPN)的最高分数检测到的,该计算指标是严重性、发生率和检测率。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
审稿时长
8 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信