The Role of Social Impact Assessment (SIA) in the Development of a Mine Closure Plan in Regional Australia

Q1 Social Sciences
Zobaidul Kabir
{"title":"The Role of Social Impact Assessment (SIA) in the Development of a Mine Closure Plan in Regional Australia","authors":"Zobaidul Kabir","doi":"10.1142/s1464333222500156","DOIUrl":null,"url":null,"abstract":"Mine closure is an integral part of the lifecycle of a mining project. The closure of a mine has social impacts on the surrounding community and employees who have gradually become dependent on the mine financially, culturally and emotionally. By recognising the consequences of mine closure on local communities, companies respond to the assessment and management of the social impacts. While there are applications of social impact assessments (SIAs) for areas available in different sectors, there are limited practices of SIA for mine closure planning, and there is a lack of information on the role of SIA in mine closure planning. Importantly, there is a dearth of information on how SIA can play an important role to make a mine closure plan by bringing all stakeholders together. This empirical study investigated the contribution of SIA on the development of a coal mine closure plan in regional Queensland in Australia. By integrating social issues and community concerns into the closure planning process, through SIA of the closure planning, the mining company, its employee and the local community were collectively able to formulate the mine closure. This study shows how the SIA can be used to bring relevant stakeholders together to formulate the plan for mine closure and make it acceptable to the stakeholders including company, local communities and employees. Practical policy implications include community engagement through SIA and an assurance of the socioeconomic security of the local community and employees of the mine. It is crucial to undertake SIA at the beginning of the closure planning process and involve the relevant stakeholders to formulate closure plan acceptable to all relevant parties. For the development of a mine closure plan, particular attention is required to address the community’s concerns and the development of a solid relationship with the community through negotiations. It is expected that the findings of this study will be useful to researchers, practitioners and other interested persons, not only in Australia but also in other countries with a similar context.","PeriodicalId":35909,"journal":{"name":"Journal of Environmental Assessment Policy and Management","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2022-05-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Environmental Assessment Policy and Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1142/s1464333222500156","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"Social Sciences","Score":null,"Total":0}
引用次数: 6

Abstract

Mine closure is an integral part of the lifecycle of a mining project. The closure of a mine has social impacts on the surrounding community and employees who have gradually become dependent on the mine financially, culturally and emotionally. By recognising the consequences of mine closure on local communities, companies respond to the assessment and management of the social impacts. While there are applications of social impact assessments (SIAs) for areas available in different sectors, there are limited practices of SIA for mine closure planning, and there is a lack of information on the role of SIA in mine closure planning. Importantly, there is a dearth of information on how SIA can play an important role to make a mine closure plan by bringing all stakeholders together. This empirical study investigated the contribution of SIA on the development of a coal mine closure plan in regional Queensland in Australia. By integrating social issues and community concerns into the closure planning process, through SIA of the closure planning, the mining company, its employee and the local community were collectively able to formulate the mine closure. This study shows how the SIA can be used to bring relevant stakeholders together to formulate the plan for mine closure and make it acceptable to the stakeholders including company, local communities and employees. Practical policy implications include community engagement through SIA and an assurance of the socioeconomic security of the local community and employees of the mine. It is crucial to undertake SIA at the beginning of the closure planning process and involve the relevant stakeholders to formulate closure plan acceptable to all relevant parties. For the development of a mine closure plan, particular attention is required to address the community’s concerns and the development of a solid relationship with the community through negotiations. It is expected that the findings of this study will be useful to researchers, practitioners and other interested persons, not only in Australia but also in other countries with a similar context.
社会影响评估(SIA)在制定澳大利亚区域关闭矿山计划中的作用
矿山关闭是矿山项目生命周期的重要组成部分。煤矿的关闭会对周围的社区和雇员产生社会影响,他们逐渐在经济、文化和情感上依赖煤矿。通过认识到煤矿关闭对当地社区的影响,企业对社会影响的评估和管理做出了回应。虽然社会影响评价在不同部门的可用地区有所应用,但是社会影响评价在关闭矿山规划方面的做法有限,而且缺乏关于社会影响评价在关闭矿山规划中的作用的资料。重要的是,缺乏关于SIA如何通过将所有利益相关者聚集在一起,在制定矿山关闭计划方面发挥重要作用的信息。本实证研究考察了SIA对澳大利亚昆士兰地区煤矿关闭计划制定的贡献。通过将社会问题和社区关注的问题纳入关闭计划过程,通过关闭计划的SIA,矿业公司、其雇员和当地社区能够共同制定矿山关闭计划。本研究展示了如何利用SIA将相关利益相关者聚集在一起制定矿山关闭计划,并使其为包括公司,当地社区和员工在内的利益相关者所接受。实际的政策影响包括通过SIA进行社区参与,并确保当地社区和矿山员工的社会经济安全。在关闭计划过程的开始就进行SIA,并让相关利益相关者参与制定所有相关方都能接受的关闭计划是至关重要的。为了制订一项关闭地雷计划,必须特别注意解决社区的关切问题,并通过谈判与社区建立牢固的关系。预计本研究的结果将对研究人员、从业人员和其他感兴趣的人有用,不仅在澳大利亚,而且在其他具有类似背景的国家。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Journal of Environmental Assessment Policy and Management
Journal of Environmental Assessment Policy and Management Social Sciences-Geography, Planning and Development
CiteScore
7.00
自引率
0.00%
发文量
18
期刊介绍: The Journal of Environmental Assessment Policy and Management is an interdisciplinary, peer reviewed, international journal covering policy and decision-making relating to environmental assessment (EA) in the broadest sense. Uniquely, its specific aim is to explore the horizontal interactions between assessment and aspects of environmental management (not just the vertical interactions within the broad field of impact assessment) and thereby to identify comprehensive approaches to environmental improvement involving both qualitative and quantitative information. As the concepts associated with sustainable development mature, links between environmental assessment and management systems become all the more essential.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信