{"title":"Mathematical model bounds for maximizing the minimum completion time problem","authors":"M. Jemmali, A. Alourani","doi":"10.17512/jamcm.2021.4.04","DOIUrl":null,"url":null,"abstract":"This paper focuses on the parallel machine scheduling problem related to maximizing the minimum completion time. This problem affects several industrial applications. The application of this problem in real life is very impressive. This paper is based on the development of new lower bounds for the exact solution of the studied problem. It is shown in the literature that the problem is strongly NP-hard. The first developed lower bound is obtained by utilizing the probabilistic method to generate several solutions for the lower bound. The second is based on the knapsack problem with the iterative method. These numerical methods give new, better lower bounds. MSC 2010: 68M20, 90B35","PeriodicalId":43867,"journal":{"name":"Journal of Applied Mathematics and Computational Mechanics","volume":null,"pages":null},"PeriodicalIF":0.8000,"publicationDate":"2021-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Applied Mathematics and Computational Mechanics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.17512/jamcm.2021.4.04","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"MATHEMATICS","Score":null,"Total":0}
引用次数: 5

Abstract

This paper focuses on the parallel machine scheduling problem related to maximizing the minimum completion time. This problem affects several industrial applications. The application of this problem in real life is very impressive. This paper is based on the development of new lower bounds for the exact solution of the studied problem. It is shown in the literature that the problem is strongly NP-hard. The first developed lower bound is obtained by utilizing the probabilistic method to generate several solutions for the lower bound. The second is based on the knapsack problem with the iterative method. These numerical methods give new, better lower bounds. MSC 2010: 68M20, 90B35
最大化最小完成时间问题的数学模型界
研究了以最小完成时间最大化为目标的并行机器调度问题。这个问题影响到几个工业应用。这个问题在现实生活中的应用令人印象深刻。本文是基于所研究问题精确解的新下界的发展。文献表明,该问题是强np困难的。利用概率方法生成下界的若干解,得到了第一个发展的下界。第二种是基于背包问题的迭代方法。这些数值方法给出了新的、更好的下界。MSC 2010: 68m20, 90b35
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
2.00
自引率
10.00%
发文量
30
审稿时长
25 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信