FIT FOR PURPOSE WELL CONTROL EQUIPMENT SELECTION FOR WORKOVER AND WELL SERVICE RIGS THROUGH DECISION MAKING APPROACH (CASE STUDY: PT BEI)

Devid Devid, M. Siallagan
{"title":"FIT FOR PURPOSE WELL CONTROL EQUIPMENT SELECTION FOR WORKOVER AND WELL SERVICE RIGS THROUGH DECISION MAKING APPROACH (CASE STUDY: PT BEI)","authors":"Devid Devid, M. Siallagan","doi":"10.21776/ub.jemis.2021.009.02.4","DOIUrl":null,"url":null,"abstract":"PT BEI is a subsidiary of Bravo Corporation that holds 100 percent-owned and operated interest in Rocka PSC. PT BEI need to improve the flexibility of its workover and well service rigs to be operated across the operating areas to deal with dynamic business plan and rig allocation as a strategy in entering the transition period to the end of concession of Rocka PSC. Well Control equipment associated with the rig contract Scope of Work (SOW) is identified as the main potential causes of why current rigs have less flexibility. A decision-making approach is utilized to find the solution. Well data mapping combined with existing business process and applicable standards review are conducted to determine the minimum Well Control equipment requirement, selection criteria and alternatives. The Analytic Hierarchy Process (AHP) is utilized as the decision-making method to analyze the alternatives. As the result, a BOP Class II A1-R1 (Annular + Blind-Shear ram) is selected as the fit for purpose Well Control equipment. The solution implementation improves the rig flexibility and saves potential $ 90,000 investment cost per rig for the rig contractors and $ 77,000 cost avoidance per rig for PT BEI.","PeriodicalId":31715,"journal":{"name":"Journal of Engineering and Management in Industrial System","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Engineering and Management in Industrial System","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21776/ub.jemis.2021.009.02.4","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

PT BEI is a subsidiary of Bravo Corporation that holds 100 percent-owned and operated interest in Rocka PSC. PT BEI need to improve the flexibility of its workover and well service rigs to be operated across the operating areas to deal with dynamic business plan and rig allocation as a strategy in entering the transition period to the end of concession of Rocka PSC. Well Control equipment associated with the rig contract Scope of Work (SOW) is identified as the main potential causes of why current rigs have less flexibility. A decision-making approach is utilized to find the solution. Well data mapping combined with existing business process and applicable standards review are conducted to determine the minimum Well Control equipment requirement, selection criteria and alternatives. The Analytic Hierarchy Process (AHP) is utilized as the decision-making method to analyze the alternatives. As the result, a BOP Class II A1-R1 (Annular + Blind-Shear ram) is selected as the fit for purpose Well Control equipment. The solution implementation improves the rig flexibility and saves potential $ 90,000 investment cost per rig for the rig contractors and $ 77,000 cost avoidance per rig for PT BEI.
通过决策方法选择适合修井和修井服务钻机的井控设备(案例研究:pt bei)
PT BEI是Bravo Corporation的子公司,持有Rocka PSC 100%的所有权和经营权益。PT BEI需要提高其修井和修井钻机在整个作业区运营的灵活性,以应对动态商业计划和钻机分配,作为进入Rocka PSC特许权结束过渡期的战略。与钻机合同工作范围(SOW)相关的井控设备被确定为当前钻机灵活性较低的主要潜在原因。采用决策方法来找到解决方案。结合现有业务流程和适用标准审查进行井数据映射,以确定最低井控设备要求、选择标准和替代方案。采用层次分析法(AHP)作为备选方案的决策方法。因此,选择II级防喷器A1-R1(环形+盲剪切闸板)作为适用的井控设备。该解决方案的实施提高了钻机的灵活性,为钻机承包商节省了每台钻机90000美元的潜在投资成本,为PT BEI节省了每架钻机77000美元的成本。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
审稿时长
16 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信