Two parametric functional dependents of time for construction of horizontal mining facilities in gneiss and schist

Nikolinka Doneva, Z. Despodov, D. Mirakovski, M. Hadži-Nikolova, Stojanče Mijalkovski
{"title":"Two parametric functional dependents of time for construction of horizontal mining facilities in gneiss and schist","authors":"Nikolinka Doneva, Z. Despodov, D. Mirakovski, M. Hadži-Nikolova, Stojanče Mijalkovski","doi":"10.5937/PODRAD1934001D","DOIUrl":null,"url":null,"abstract":"This paper presents the analysis of the construction of horizontal mining facilities where 18 variants of mining facilities were developed. The aim of this research was to determine the required time for construction of all variants and then to reduce it to the time required for construction of 1 m` per facilities. Also the required time for construction of 1000 m' of the same facilities is calculated. Based on analysis, two parametric functional dependents of construction time are determined in relation of uniaxial compressive strength of rock mass and the size of the facilities` cross section.","PeriodicalId":31689,"journal":{"name":"Podzemni Radovi","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-06-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Podzemni Radovi","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5937/PODRAD1934001D","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This paper presents the analysis of the construction of horizontal mining facilities where 18 variants of mining facilities were developed. The aim of this research was to determine the required time for construction of all variants and then to reduce it to the time required for construction of 1 m` per facilities. Also the required time for construction of 1000 m' of the same facilities is calculated. Based on analysis, two parametric functional dependents of construction time are determined in relation of uniaxial compressive strength of rock mass and the size of the facilities` cross section.
片麻岩和片岩中水平采矿设施建设的两个时间参数函数依赖项
本文对开发了18种采矿设施变体的水平采矿设施的建设进行了分析。这项研究的目的是确定所有变体的施工所需时间,然后将其减少到每个设施施工1米所需的时间。此外,还计算了建造1000m’相同设施所需的时间。在此基础上,确定了施工时间与岩体单轴抗压强度和设施横截面尺寸之间的两个参数函数关系。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
审稿时长
4 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信