A hybrid risk assessment approach for assessing the earthquake risks in worn-out urban fabrics: a case study in Iran

IF 0.9 Q4 ENVIRONMENTAL STUDIES
Jalal Sadeghi, M. Oghabi, H. Sarvari, M. Sabeti, H. Kashefi, Daniel W. M. Chan, A. Lotfata
{"title":"A hybrid risk assessment approach for assessing the earthquake risks in worn-out urban fabrics: a case study in Iran","authors":"Jalal Sadeghi, M. Oghabi, H. Sarvari, M. Sabeti, H. Kashefi, Daniel W. M. Chan, A. Lotfata","doi":"10.1108/ijdrbe-09-2021-0128","DOIUrl":null,"url":null,"abstract":"\nPurpose\nTo reduce financial and human losses, managing risks associated with earthquakes is essential in practice. However, in using common risk management methods, experts are often faced with ambiguities that can create profound challenges for risk management. Therefore, it is necessary to develop a logical and straightforward risk assessment model to provide scientific and accurate answers to complex problems. This study aims to recommend an innovative combined method based on the probability-impact (P-I) approach and intuitionistic fuzzy set theory to identify and prioritize the essential earthquake risks associated with worn-out urban fabrics in the context of Iran.\n\n\nDesign/methodology/approach\nThe opinions of 15 experts in the fields of civil engineering and urban construction were gathered during brainstorming sessions. These brainstorming sessions were conducted to determine the probability of risks and the effect of identified risks. After calculating the severity of risks using the P-I approach and converting them to intuitionistic fuzzy sets, the risks were measured and prioritized based on their individual scores.\n\n\nFindings\nThe study results indicated that risk of damage due to buildings’ age and flooding risk had the highest and lowest priorities in causes of financial damage, respectively. Furthermore, the risk of damage due to building quality (demolition) and building age was the most important. The risk of flooding and damage to communication networks has the lowest importance among causes of fatalities in worn-out urban fabrics.\n\n\nOriginality/value\nThe study findings and recommendations can be served as a policy and consultative instrument for the relevant stakeholders in the area of urban management.\n","PeriodicalId":45983,"journal":{"name":"International Journal of Disaster Resilience in the Built Environment","volume":" ","pages":""},"PeriodicalIF":0.9000,"publicationDate":"2021-12-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Disaster Resilience in the Built Environment","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/ijdrbe-09-2021-0128","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENVIRONMENTAL STUDIES","Score":null,"Total":0}
引用次数: 0

Abstract

Purpose To reduce financial and human losses, managing risks associated with earthquakes is essential in practice. However, in using common risk management methods, experts are often faced with ambiguities that can create profound challenges for risk management. Therefore, it is necessary to develop a logical and straightforward risk assessment model to provide scientific and accurate answers to complex problems. This study aims to recommend an innovative combined method based on the probability-impact (P-I) approach and intuitionistic fuzzy set theory to identify and prioritize the essential earthquake risks associated with worn-out urban fabrics in the context of Iran. Design/methodology/approach The opinions of 15 experts in the fields of civil engineering and urban construction were gathered during brainstorming sessions. These brainstorming sessions were conducted to determine the probability of risks and the effect of identified risks. After calculating the severity of risks using the P-I approach and converting them to intuitionistic fuzzy sets, the risks were measured and prioritized based on their individual scores. Findings The study results indicated that risk of damage due to buildings’ age and flooding risk had the highest and lowest priorities in causes of financial damage, respectively. Furthermore, the risk of damage due to building quality (demolition) and building age was the most important. The risk of flooding and damage to communication networks has the lowest importance among causes of fatalities in worn-out urban fabrics. Originality/value The study findings and recommendations can be served as a policy and consultative instrument for the relevant stakeholders in the area of urban management.
评估破旧城市结构地震风险的混合风险评估方法——以伊朗为例
目的为了减少经济和人员损失,管理与地震相关的风险在实践中至关重要。然而,在使用常见的风险管理方法时,专家们经常面临歧义,这可能会给风险管理带来深刻挑战。因此,有必要开发一个逻辑简单的风险评估模型,为复杂问题提供科学准确的答案。本研究旨在推荐一种基于概率影响(P-I)方法和直觉模糊集理论的创新组合方法,以在伊朗的背景下识别和优先考虑与破旧城市结构相关的基本地震风险。设计/方法/方法头脑风暴会议。进行这些头脑风暴会议是为了确定风险的概率和已识别风险的影响。在使用P-I方法计算风险的严重程度并将其转换为直觉模糊集后,根据风险的个人得分对风险进行测量和排序。研究结果表明,建筑物老化造成的损坏风险和洪水风险分别是造成经济损失的最高和最低优先级。此外,建筑质量(拆除)和建筑年代造成的损坏风险是最重要的。在破旧的城市结构中,洪水和通信网络损坏的风险在死亡原因中的重要性最低。原创性/价值研究结果和建议可作为城市管理领域相关利益相关者的政策和咨询工具。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
3.40
自引率
6.20%
发文量
49
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信