Risk prioritisation using fuzzy analytic network process: A case of Addis–Djibouti railway construction project

IF 1.9 Q3 MANAGEMENT
Tesfaye Gashaw, Kassu Jilcha
{"title":"Risk prioritisation using fuzzy analytic network process: A case of Addis–Djibouti railway construction project","authors":"Tesfaye Gashaw,&nbsp;Kassu Jilcha","doi":"10.1002/mcda.1776","DOIUrl":null,"url":null,"abstract":"<p>The purpose of this paper is to develop a risk assessment model to prioritise the risks of railway construction projects. A fuzzy analytic network process (FANP) is employed to rank project risks based on the likelihood of project risks and their impact on cost and time. Fuzzy set theory is used to represent the vagueness in each expert's judgment, while ANP is used to deal with interdependence and feedback effects of risks. The data for this study was collected through literature reviews, interviews, and questionnaires. According to the study results, the right-of-way corresponds to the top risk that has highest impact on time and cost. Construction errors and incomplete contract details were found to rank second and third in terms of risk severity. Similarly, design changes and lack of coordination among parties are ranked fourth and fifth, respectively. The study results help practitioners and decision-makers understand the main risks of the Ethiopian railway construction projects and take proactive actions accordingly. Furthermore, this paper can help researchers' model project risks and analyse their impact on project objectives considering uncertainty, interdependence, and feedback.</p>","PeriodicalId":45876,"journal":{"name":"Journal of Multi-Criteria Decision Analysis","volume":"29 3-4","pages":"313-324"},"PeriodicalIF":1.9000,"publicationDate":"2021-11-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Multi-Criteria Decision Analysis","FirstCategoryId":"1085","ListUrlMain":"https://onlinelibrary.wiley.com/doi/10.1002/mcda.1776","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 4

Abstract

The purpose of this paper is to develop a risk assessment model to prioritise the risks of railway construction projects. A fuzzy analytic network process (FANP) is employed to rank project risks based on the likelihood of project risks and their impact on cost and time. Fuzzy set theory is used to represent the vagueness in each expert's judgment, while ANP is used to deal with interdependence and feedback effects of risks. The data for this study was collected through literature reviews, interviews, and questionnaires. According to the study results, the right-of-way corresponds to the top risk that has highest impact on time and cost. Construction errors and incomplete contract details were found to rank second and third in terms of risk severity. Similarly, design changes and lack of coordination among parties are ranked fourth and fifth, respectively. The study results help practitioners and decision-makers understand the main risks of the Ethiopian railway construction projects and take proactive actions accordingly. Furthermore, this paper can help researchers' model project risks and analyse their impact on project objectives considering uncertainty, interdependence, and feedback.

基于模糊网络分析法的风险排序——以亚吉铁路建设项目为例
本文的目的是建立一个铁路建设项目风险排序的风险评估模型。基于项目风险发生的可能性及其对成本和时间的影响,采用模糊网络分析法对项目风险进行排序。采用模糊集理论表示专家判断的模糊性,采用ANP理论处理风险的相互依赖和反馈效应。本研究的数据是通过文献综述、访谈和问卷调查收集的。研究结果表明,路权对应于对时间和成本影响最大的最高风险。施工错误和合同细节不完整的风险程度分别排在第二和第三位。同样,设计变更和各方缺乏协调分别排在第四位和第五位。研究结果有助于从业者和决策者了解埃塞俄比亚铁路建设项目的主要风险,并采取相应的积极行动。此外,本文可以帮助研究人员建立项目风险模型,并分析它们对考虑不确定性、相互依赖性和反馈的项目目标的影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
4.70
自引率
10.00%
发文量
14
期刊介绍: The Journal of Multi-Criteria Decision Analysis was launched in 1992, and from the outset has aimed to be the repository of choice for papers covering all aspects of MCDA/MCDM. The journal provides an international forum for the presentation and discussion of all aspects of research, application and evaluation of multi-criteria decision analysis, and publishes material from a variety of disciplines and all schools of thought. Papers addressing mathematical, theoretical, and behavioural aspects are welcome, as are case studies, applications and evaluation of techniques and methodologies.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信