{"title":"Reduction of Overvoltages under Connection on a High-Voltage Cable Line Due to Optimal Controlled Switching","authors":"V. Lobodzinskiy, Nikolay Buryk, L.Yu. Spinul, Valeriy Chibelis, O. Illina","doi":"10.52254/1857-0070.2023.3-59.03","DOIUrl":null,"url":null,"abstract":"The purpose of the work is to develop a mathematical model of a cable transmission line, which allows modeling and choosing the optimal conditions for controlled switching to limit overvoltage at the development and design stage. The goal is achieved by solving the problem of determining the initial angle of each phase, so that each phase has an initial switching angle equal to zero with a time delay. A high-voltage cable line for a voltage of 330 kV, implemented using Matlab, has been chosen as the object of study. The most significant result is the method of numerical simulation of the cable line that allows you to analyze transients when each phase of a three-phase cable line is connected to a three-phase source with a time delay, the switching angle of all phases is zero. This, in turn, makes it possible to limit switching overvoltages. The significance of the results obtained lies in the possibility of the proposed technique to choose the optimal conditions for controlled switching, which makes it possible to use it in the design of switching nodes, as well as the use of controlled switching to eliminate unwanted electrical transients during planned switching. The simulation results showed that the greatest effect of using numerical simulation is when each phase of a three-phase cable line is connected to a three-phase source with a time delay of 1/150 second, then the switching angle of all phases is zero, which makes it possible to limit switching overvoltages. Keywords: three-phase cable line, switching overvoltage, transient processes, controlled switching, theory of multipoles, modeling of electrical engineering objects.","PeriodicalId":41974,"journal":{"name":"Problemele Energeticii Regionale","volume":null,"pages":null},"PeriodicalIF":0.3000,"publicationDate":"2023-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Problemele Energeticii Regionale","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.52254/1857-0070.2023.3-59.03","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENERGY & FUELS","Score":null,"Total":0}
引用次数: 0

Abstract

The purpose of the work is to develop a mathematical model of a cable transmission line, which allows modeling and choosing the optimal conditions for controlled switching to limit overvoltage at the development and design stage. The goal is achieved by solving the problem of determining the initial angle of each phase, so that each phase has an initial switching angle equal to zero with a time delay. A high-voltage cable line for a voltage of 330 kV, implemented using Matlab, has been chosen as the object of study. The most significant result is the method of numerical simulation of the cable line that allows you to analyze transients when each phase of a three-phase cable line is connected to a three-phase source with a time delay, the switching angle of all phases is zero. This, in turn, makes it possible to limit switching overvoltages. The significance of the results obtained lies in the possibility of the proposed technique to choose the optimal conditions for controlled switching, which makes it possible to use it in the design of switching nodes, as well as the use of controlled switching to eliminate unwanted electrical transients during planned switching. The simulation results showed that the greatest effect of using numerical simulation is when each phase of a three-phase cable line is connected to a three-phase source with a time delay of 1/150 second, then the switching angle of all phases is zero, which makes it possible to limit switching overvoltages. Keywords: three-phase cable line, switching overvoltage, transient processes, controlled switching, theory of multipoles, modeling of electrical engineering objects.
通过最优控制开关降低高压电缆线路连接下的过电压
该工作的目的是建立电缆传输线的数学模型,以便在开发和设计阶段建模和选择控制开关的最佳条件以限制过电压。通过解决确定各相位初始角度的问题,使各相位的初始开关角等于零,并具有延时,从而达到目标。本文以330 kV高压电缆线路为研究对象,采用Matlab软件实现。最重要的结果是电缆线路的数值模拟方法,该方法允许您分析三相电缆线路的每一相连接到具有时间延迟的三相源时,所有相位的开关角为零的瞬变。反过来,这使得限制开关过电压成为可能。所获得的结果的意义在于,所提出的技术可以选择控制开关的最佳条件,从而可以将其用于开关节点的设计,以及使用控制开关来消除计划开关过程中不必要的电瞬变。仿真结果表明,采用数值模拟的最大效果是当三相电缆线路的每一相以1/150秒的延时连接到三相源时,各相的开关角均为零,从而可以限制开关过电压。关键词:三相电缆线路,开关过电压,瞬态过程,控制开关,多极理论,电气工程对象建模
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
0.70
自引率
33.30%
发文量
38
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信