Analysis of the time efficiency of skidding technology based on the skidders

IF 1.4 Q2 FORESTRY
Lukáš Orlovský, V. Messingerová, Z. Danihelová
{"title":"Analysis of the time efficiency of skidding technology based on the skidders","authors":"Lukáš Orlovský, V. Messingerová, Z. Danihelová","doi":"10.2478/forj-2020-0016","DOIUrl":null,"url":null,"abstract":"Abstract The time efficiency and principles of ergonomics related to timber skidding are based on the time consumption per work cycle as well as on the time consumption per individual work operations. Regarding the demands on the environmental requirements and ever increasing cost of work, it is necessary to objectively evaluate the inevitable time consumption required for timber skidding using all technologies. The paper summarised the results of time studies for skidder technologies. The time study compares the time consumption and productivity of cable skidders and cable-grapple skidders, with the main focus on developing time prediction models. The main aim of the study was to objectify the skidder time consumption and establish the impact of production factors on the time consumption of partial work operations of skidders. Within the time study 231 work cycles were measured, and 53 snapshots of work day with using methods continual time study. The overall time consumption of the work cycle and gross production rate of the monitored cable and cable-grapple skidders is affected by the following production factors: the skidding distance, volume of skidded logs and number of skidded logs. The impact of individual production factors on the overall time consumption of the work cycle is different for each group of skidders. Non-operation times of the skidder operators’ shifts represent 24.6% with the highest part taken by the technical operation of the work place. The mean gross production rate of the monitored skidders varied from 33.3 to 6.91 m3 h−1.","PeriodicalId":45042,"journal":{"name":"Central European Forestry Journal","volume":"66 1","pages":"177 - 187"},"PeriodicalIF":1.4000,"publicationDate":"2020-08-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Central European Forestry Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/forj-2020-0016","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"FORESTRY","Score":null,"Total":0}
引用次数: 5

Abstract

Abstract The time efficiency and principles of ergonomics related to timber skidding are based on the time consumption per work cycle as well as on the time consumption per individual work operations. Regarding the demands on the environmental requirements and ever increasing cost of work, it is necessary to objectively evaluate the inevitable time consumption required for timber skidding using all technologies. The paper summarised the results of time studies for skidder technologies. The time study compares the time consumption and productivity of cable skidders and cable-grapple skidders, with the main focus on developing time prediction models. The main aim of the study was to objectify the skidder time consumption and establish the impact of production factors on the time consumption of partial work operations of skidders. Within the time study 231 work cycles were measured, and 53 snapshots of work day with using methods continual time study. The overall time consumption of the work cycle and gross production rate of the monitored cable and cable-grapple skidders is affected by the following production factors: the skidding distance, volume of skidded logs and number of skidded logs. The impact of individual production factors on the overall time consumption of the work cycle is different for each group of skidders. Non-operation times of the skidder operators’ shifts represent 24.6% with the highest part taken by the technical operation of the work place. The mean gross production rate of the monitored skidders varied from 33.3 to 6.91 m3 h−1.
基于集材机的集材技术时效性分析
摘要木材打滑的时间效率和工效学原理基于每个工作周期的时间消耗以及每个单独工作操作的时间消耗。考虑到对环境要求的要求和不断增加的工作成本,有必要客观评估使用所有技术进行木材打滑所需的不可避免的时间消耗。本文总结了集材机技术的时间研究结果。时间研究比较了缆索集材机和抓斗集材机的时间消耗和生产率,主要侧重于开发时间预测模型。本研究的主要目的是客观化集材机的时间消耗,并确定生产因素对集材机部分作业时间消耗的影响。在时间研究中,使用连续时间研究的方法测量了231个工作周期和53个工作日快照。受监测的电缆和电缆抓斗集材机的工作周期总时间消耗和毛生产率受以下生产因素的影响:集材距离、集材量和集材数量。每一组集材机的单个生产因素对工作周期总时间消耗的影响是不同的。集材机操作员轮班的非操作时间占24.6%,其中工作场所的技术操作所占比例最高。监测集材机的平均毛生产率在33.3至6.91 m3 h−1之间。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
3.20
自引率
6.20%
发文量
23
审稿时长
22 weeks
期刊介绍: Central European Forestry Journal (published as Lesnícky Èasopis - Forestry Journal until 2016) publishes novel science originating from research in forestry and related braches. Central European Forestry Journal is a professional peer-reviewed scientific journal published 4-time a year. The journal contains original papers and review papers of basic and applied research from all fields of forestry and related disciplines. The editorial office accepts the manuscripts within the focus of the journal exclusively in English language. The journal does not have article processing charges (APCs) nor article submission charges. Central European Forestry Journal, abbreviation: Cent. Eur. For. J., publishes original papers and review papers of basic and applied research from all fields of forestry and related scientific areas. The journal focuses on forestry issues relevant for Europe, primarily Central European regions. Original works and review papers can be submitted only in English language.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信