Optimization Scheduling Method of Solar Photovoltaic and Fuel Cell Combined Power Generation System

Q3 Environmental Science
Xiao Xue, Yangbin Zheng, Yajie Duan
{"title":"Optimization Scheduling Method of Solar Photovoltaic and Fuel Cell Combined Power Generation System","authors":"Xiao Xue, Yangbin Zheng, Yajie Duan","doi":"10.13052/spee1048-5236.4213","DOIUrl":null,"url":null,"abstract":"The performance of the battery used in the traditional solar photovoltaic power generation system is poor, and the solar energy has a certain volatility, which makes the performance of the solar photovoltaic power generation system decline significantly. In order to improve the performance of the solar photovoltaic power generation system, a solar photovoltaic fuel cell combined power generation system has been developed. However, there are some problems in the process of traditional combined generation system optimal scheduling, such as high investment cost and total cost, and short generation time of optimal scheduling scheme. This paper takes solving the problems of traditional system optimal scheduling as the research goal, a new optimization scheduling method of solar photovoltaic and fuel cell combined power generation system was designed. The composition and topological structure of the solar photovoltaic fuel cell combined power generation system are analyzed. The system is composed of photovoltaic array, fuel cell, electrolytic cell, short-term energy storage unit and energy control unit. It can mainly convert sunlight radiation into electric energy, and convert it into DC or AC used by people through multiple links, so as to ensure the stability and security of power supply in our country. A scheduling model is established according to the photovoltaic cell power generation model, the fuel cell power generation model, the electrolytic hydrogen production model, the battery model, the power conversion model and the combined power generation system model. And the multi-objective cuckoo algorithm is used to solve the model, the optimization scheduling results of solar photovoltaic fuel cell combined power generation system are obtained. The experimental results show that the total investment cost of this method is reduced by 123678.4 yuan and 175858.7 yuan compared with the experimental comparison method, and the total cost is reduced by 301195.5 yuan and 414991.8 yuan compared with the experimental comparison method. It shows that compared with the experimental comparison method, the total investment cost and total cost of this method are lower, and the generation time of the optimal scheduling scheme is between 0.19s and 0.25s, and the practical application effect is good. It fully solves the problems existing in the traditional methods and has certain application significance.","PeriodicalId":35712,"journal":{"name":"Strategic Planning for Energy and the Environment","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2022-12-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Strategic Planning for Energy and the Environment","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.13052/spee1048-5236.4213","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Environmental Science","Score":null,"Total":0}
引用次数: 0

Abstract

The performance of the battery used in the traditional solar photovoltaic power generation system is poor, and the solar energy has a certain volatility, which makes the performance of the solar photovoltaic power generation system decline significantly. In order to improve the performance of the solar photovoltaic power generation system, a solar photovoltaic fuel cell combined power generation system has been developed. However, there are some problems in the process of traditional combined generation system optimal scheduling, such as high investment cost and total cost, and short generation time of optimal scheduling scheme. This paper takes solving the problems of traditional system optimal scheduling as the research goal, a new optimization scheduling method of solar photovoltaic and fuel cell combined power generation system was designed. The composition and topological structure of the solar photovoltaic fuel cell combined power generation system are analyzed. The system is composed of photovoltaic array, fuel cell, electrolytic cell, short-term energy storage unit and energy control unit. It can mainly convert sunlight radiation into electric energy, and convert it into DC or AC used by people through multiple links, so as to ensure the stability and security of power supply in our country. A scheduling model is established according to the photovoltaic cell power generation model, the fuel cell power generation model, the electrolytic hydrogen production model, the battery model, the power conversion model and the combined power generation system model. And the multi-objective cuckoo algorithm is used to solve the model, the optimization scheduling results of solar photovoltaic fuel cell combined power generation system are obtained. The experimental results show that the total investment cost of this method is reduced by 123678.4 yuan and 175858.7 yuan compared with the experimental comparison method, and the total cost is reduced by 301195.5 yuan and 414991.8 yuan compared with the experimental comparison method. It shows that compared with the experimental comparison method, the total investment cost and total cost of this method are lower, and the generation time of the optimal scheduling scheme is between 0.19s and 0.25s, and the practical application effect is good. It fully solves the problems existing in the traditional methods and has certain application significance.
太阳能光伏与燃料电池联合发电系统优化调度方法
传统太阳能光伏发电系统中使用的电池性能较差,太阳能具有一定的波动性,这使得太阳能光伏发电体系的性能显著下降。为了提高太阳能光伏发电系统的性能,开发了一种太阳能-光伏-燃料电池联合发电系统。然而,传统的联合发电系统优化调度过程中存在投资成本和总成本高、优化调度方案生成时间短等问题。本文以解决传统系统优化调度问题为研究目标,设计了一种新的太阳能光伏与燃料电池联合发电系统优化调度方法。分析了太阳能-光伏-燃料电池联合发电系统的组成和拓扑结构。该系统由光伏阵列、燃料电池、电解槽、短期储能单元和能量控制单元组成。它主要可以将太阳光辐射转化为电能,并通过多个环节转化为人们使用的直流或交流,以确保我国电力供应的稳定和安全。根据光伏发电模型、燃料电池发电模型、电解制氢模型、电池模型、功率转换模型和联合发电系统模型,建立调度模型。并采用多目标布谷鸟算法对模型进行求解,得到了太阳能-光伏-燃料电池联合发电系统的优化调度结果。实验结果表明,该方法的总投资成本与实验比较法相比分别降低了123678.4元和175858.7元,总成本与实验对比法相比分别减少了301195.5元和414991.8元。结果表明,与实验比较方法相比,该方法的总投资成本和总成本更低,最优调度方案的生成时间在0.19s到0.25s之间,实际应用效果良好。它充分解决了传统方法中存在的问题,具有一定的应用意义。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Strategic Planning for Energy and the Environment
Strategic Planning for Energy and the Environment Environmental Science-Environmental Science (all)
CiteScore
1.50
自引率
0.00%
发文量
25
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信