Improving the carrying capacity of irrigation canals: Al-Tawfiky diversion

Q2 Environmental Science
M. Abdelmoaty
{"title":"Improving the carrying capacity of irrigation canals: Al-Tawfiky diversion","authors":"M. Abdelmoaty","doi":"10.1080/23570008.2021.1938426","DOIUrl":null,"url":null,"abstract":"ABSTRACT The morphological changes in the irrigation channel cross-section affect its hydraulic efficiency and carrying capacity with time. Periodic maintenance activities are applied to reach maximum carrying capacity. In many cases, removing the total amount of deposit inside canal cross-section above the design bed level is not the optimum maintenance solution hydraulically and economically. Additional discharge must be applied to canal intake to achieve the design water level. Al-Tawfiky Diversion is one of the main irrigation canals in the Delta region. It extended with a length of 175 km to serve 716,540 feddan. The study encloses the first reach from intake to km 36.400 upstream Jamjara regulator. This research aims to detect the most inefficient reaches along the selected study canal reach based on the actual characteristics of the surveyed canal cross-sections, and identifying the most proper maintenance scenario hydraulically and economically. Three hundred and fifty-one cross-sections along the study reach were surveyed. The different hydraulic parameters of these cross-sections were calculated. The data was analyzed and criterion for detecting the most inefficient sub-reaches was introduced. An empirical equation connecting the applied maintenance activities with channel conveyance was deduced. A mathematical model for the study reach was built and calibrated using (SOBEK-1D) to evaluate the proposed four maintenance scenarios.","PeriodicalId":34430,"journal":{"name":"Water Science","volume":"35 1","pages":"89 - 99"},"PeriodicalIF":0.0000,"publicationDate":"2021-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1080/23570008.2021.1938426","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Water Science","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/23570008.2021.1938426","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Environmental Science","Score":null,"Total":0}
引用次数: 1

Abstract

ABSTRACT The morphological changes in the irrigation channel cross-section affect its hydraulic efficiency and carrying capacity with time. Periodic maintenance activities are applied to reach maximum carrying capacity. In many cases, removing the total amount of deposit inside canal cross-section above the design bed level is not the optimum maintenance solution hydraulically and economically. Additional discharge must be applied to canal intake to achieve the design water level. Al-Tawfiky Diversion is one of the main irrigation canals in the Delta region. It extended with a length of 175 km to serve 716,540 feddan. The study encloses the first reach from intake to km 36.400 upstream Jamjara regulator. This research aims to detect the most inefficient reaches along the selected study canal reach based on the actual characteristics of the surveyed canal cross-sections, and identifying the most proper maintenance scenario hydraulically and economically. Three hundred and fifty-one cross-sections along the study reach were surveyed. The different hydraulic parameters of these cross-sections were calculated. The data was analyzed and criterion for detecting the most inefficient sub-reaches was introduced. An empirical equation connecting the applied maintenance activities with channel conveyance was deduced. A mathematical model for the study reach was built and calibrated using (SOBEK-1D) to evaluate the proposed four maintenance scenarios.
提高灌溉渠道的承载能力:Al Tawfiky引水
灌溉渠道断面的形态变化会影响其水力效率和通过能力。采用定期维护活动以达到最大承载能力。在许多情况下,从水力和经济角度来看,将运河横截面内的沉积物总量清除到设计河床高程以上并不是最佳的维护解决方案。为了达到设计水位,必须对渠道进水口进行额外的排水。Al Tawfiky引水渠是三角洲地区的主要灌溉渠之一。它延伸了175公里,服务于716540联邦丹。该研究涵盖了从进水口到Jamjara调节器上游36.400 km的第一个河段。本研究旨在根据调查运河横截面的实际特征,检测选定研究运河河段中效率最高的河段,并确定最合适的水力和经济维护方案。调查了研究河段沿线的351个横截面。计算了这些横截面的不同水力参数。对数据进行了分析,并介绍了检测最低效子河段的标准。推导了应用维修活动与渠道输送之间的经验方程。使用(SOBEK-1D)建立并校准了研究范围的数学模型,以评估提出的四种维护方案。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Water Science
Water Science Environmental Science-Ecology
CiteScore
3.00
自引率
0.00%
发文量
12
审稿时长
18 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信