Utilization of the secondary resources of titanium-zirconium pits when constructing highways

Q3 Engineering
O. Lozhnikov, B. Sobko, A. Pavlychenko, Yu. O Kirichek
{"title":"Utilization of the secondary resources of titanium-zirconium pits when constructing highways","authors":"O. Lozhnikov, B. Sobko, A. Pavlychenko, Yu. O Kirichek","doi":"10.33271/nvngu/2023-4/124","DOIUrl":null,"url":null,"abstract":"Purpose. To develop a methodology for determining the economically feasible distance of construction sand haulage, which is a secondary raw material of ore pits, to highway construction sites in comparison with the delivery of sand from mining enterprises of building materials, taking into account land conservation indicators. Methodology. The research used a set of methods: analytical method – to establish the main technical and economic indicators that affect the cost of delivering sand from the mining enterprises to the road construction site; technical and economic analysis – to determine the influence of the building materials haulage distance on the cost of construction works. Findings. The economically permissible haulage distance for sands form titanium-zirconium mining enterprises to highway construction objects was established in comparison with the involving of sands from deposits of building materials. It has been proven that under the conditions of using the sands of the Motronivskyi MPP, where the main raw material is titanium-zirconium ores, in addition to the economic effect of the mining waste disposal, there is an ecological effect of reducing the dumps and tailings areas. At the same time, the cost of sand rocks during the construction of the road surface will be reduced by 3 to 60 %, depending on the distance to the construction road site. All together, the area of lands saved from being disturbed by new mining operations will reach 3.3 hectares during the construction of a 2.5 km long category I-b road section. Originality. Dependence was established of the sand cost and its delivery to the object of new highway construction on the materials haulage distance when purchasing sand at the enterprise of the main raw material and from the titanium-zirconium deposit, where it is developed as an associated raw material. The dependence of the economic efficiency indicator of the road construction on the increasing distance of sand rocks delivery from the titanium-zirconium deposit was determined, which allows justifying the rational haulage distance according to technical and economic indicators. Practical value. The developed method for determining the effective haulage distance for sand rocks to the construction site allows one to calculate the expediency of involving associated minerals of ore pits during the reconstruction and construction of new highways, as well as to establish the effect of resource conservation due to the reduction in the area of mining facilities during the extraction of ore and building raw materials.","PeriodicalId":19101,"journal":{"name":"Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33271/nvngu/2023-4/124","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 0

Abstract

Purpose. To develop a methodology for determining the economically feasible distance of construction sand haulage, which is a secondary raw material of ore pits, to highway construction sites in comparison with the delivery of sand from mining enterprises of building materials, taking into account land conservation indicators. Methodology. The research used a set of methods: analytical method – to establish the main technical and economic indicators that affect the cost of delivering sand from the mining enterprises to the road construction site; technical and economic analysis – to determine the influence of the building materials haulage distance on the cost of construction works. Findings. The economically permissible haulage distance for sands form titanium-zirconium mining enterprises to highway construction objects was established in comparison with the involving of sands from deposits of building materials. It has been proven that under the conditions of using the sands of the Motronivskyi MPP, where the main raw material is titanium-zirconium ores, in addition to the economic effect of the mining waste disposal, there is an ecological effect of reducing the dumps and tailings areas. At the same time, the cost of sand rocks during the construction of the road surface will be reduced by 3 to 60 %, depending on the distance to the construction road site. All together, the area of lands saved from being disturbed by new mining operations will reach 3.3 hectares during the construction of a 2.5 km long category I-b road section. Originality. Dependence was established of the sand cost and its delivery to the object of new highway construction on the materials haulage distance when purchasing sand at the enterprise of the main raw material and from the titanium-zirconium deposit, where it is developed as an associated raw material. The dependence of the economic efficiency indicator of the road construction on the increasing distance of sand rocks delivery from the titanium-zirconium deposit was determined, which allows justifying the rational haulage distance according to technical and economic indicators. Practical value. The developed method for determining the effective haulage distance for sand rocks to the construction site allows one to calculate the expediency of involving associated minerals of ore pits during the reconstruction and construction of new highways, as well as to establish the effect of resource conservation due to the reduction in the area of mining facilities during the extraction of ore and building raw materials.
公路建设中钛锆矿二次资源的利用
目的。在考虑到土地保护指标的情况下,制定一种方法,以确定从建筑材料矿山企业运送砂石到公路建筑工地的经济可行距离,砂石是矿坑的二级原料。方法。本研究采用了一套方法:分析方法——建立影响矿山企业向道路施工现场输送沙子成本的主要技术经济指标;技术经济分析-确定建筑材料运输距离对建筑工程成本的影响。发现。通过对钛锆矿企业砂与建筑材料砂的经济允许运输距离的比较,确定了钛锆矿企业砂对公路建设对象的经济允许运输距离。实践证明,在以钛锆矿为主要原料的Motronivskyi MPP砂的使用条件下,除了具有矿山废弃物处理的经济效应外,还具有减少堆积场和尾矿库面积的生态效应。同时,根据距离施工道路现场的距离,路面施工时的砂石成本将降低3 ~ 60% %。总而言之,在建设一条2.5公里长的I-b类公路期间,新采矿作业所节省的土地面积将达到3.3公顷。创意。在主要原料企业和作为伴生原料开发的钛锆矿床采购砂石时,建立了砂石成本及其运输到新建公路建设对象的依赖于物料运输距离。确定了公路建设经济效益指标与钛锆矿床砂石运输距离增加的依赖关系,从而根据技术经济指标对合理的运输距离进行论证。实用价值。所开发的确定砂石到施工现场的有效运输距离的方法,可以计算在新公路的改造和建设过程中涉及矿坑伴生矿物的便利性,以及在提取矿石和建筑原材料过程中由于采矿设施面积的减少而产生的资源节约效果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
1.70
自引率
0.00%
发文量
148
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信