Creation of new logistics for the export of arctic mineral resources as a condition for their sustainable development

IF 0.8 Q3 ENGINEERING, PETROLEUM
Georesursy Pub Date : 2023-06-30 DOI:10.18599/grs.2023.2.3
M. N. Grigoryev
{"title":"Creation of new logistics for the export of arctic mineral resources as a condition for their sustainable development","authors":"M. N. Grigoryev","doi":"10.18599/grs.2023.2.3","DOIUrl":null,"url":null,"abstract":"An overview of possible transformations of logistic schemes for the export of mineral raw materials mined in the Arctic zone of the Russian Federation is presented. The existing system of transportation of mineral raw materials by sea, rail, inland water, road and air transport is considered. The description of mineral resource centers forming the cargo base of the Arctic transport system is given; their typification by types of transport for the export of products is given. A change in logistics schemes in connection with access to new markets in the changed geopolitical conditions was considered. The need for changes does not apply to rail, inland water, road and aviation transport, which provide mainly domestic transportation. Major changes affect pipeline and maritime transport. It was concluded that it is necessary to create liquefied natural gas production facilities at the exit points to the coast of the poorly devoured seas of main gas pipelines in order to monetize pipeline gas and expand the throughput capacity of main oil pipelines suitable for port oil loading terminals of the Baltic and Black Seas. The conditions for delivery to Asian oil export markets by sea have deteriorated due to the increase in the duration of circular flights and the cost of tanker freight. In addition, the possibility of an increase in the cargo traffic of the oil export to the Asian market in the Northern Sea Route was questioned due to the lack of a high deadweight cargo fleet and the required Arctic ice classes. The proposal on the need to revise strategic planning documents adopted in other political and economic conditions based on the current realities is justified.","PeriodicalId":43752,"journal":{"name":"Georesursy","volume":null,"pages":null},"PeriodicalIF":0.8000,"publicationDate":"2023-06-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Georesursy","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.18599/grs.2023.2.3","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, PETROLEUM","Score":null,"Total":0}
引用次数: 0

Abstract

An overview of possible transformations of logistic schemes for the export of mineral raw materials mined in the Arctic zone of the Russian Federation is presented. The existing system of transportation of mineral raw materials by sea, rail, inland water, road and air transport is considered. The description of mineral resource centers forming the cargo base of the Arctic transport system is given; their typification by types of transport for the export of products is given. A change in logistics schemes in connection with access to new markets in the changed geopolitical conditions was considered. The need for changes does not apply to rail, inland water, road and aviation transport, which provide mainly domestic transportation. Major changes affect pipeline and maritime transport. It was concluded that it is necessary to create liquefied natural gas production facilities at the exit points to the coast of the poorly devoured seas of main gas pipelines in order to monetize pipeline gas and expand the throughput capacity of main oil pipelines suitable for port oil loading terminals of the Baltic and Black Seas. The conditions for delivery to Asian oil export markets by sea have deteriorated due to the increase in the duration of circular flights and the cost of tanker freight. In addition, the possibility of an increase in the cargo traffic of the oil export to the Asian market in the Northern Sea Route was questioned due to the lack of a high deadweight cargo fleet and the required Arctic ice classes. The proposal on the need to revise strategic planning documents adopted in other political and economic conditions based on the current realities is justified.
为北极矿产资源的出口创造新的物流,作为其可持续发展的条件
概述了在俄罗斯联邦北极地区开采的矿物原料出口的物流计划的可能转变。考虑了现有的通过海运、铁路、内河、公路和航空运输的矿物原料运输系统。对构成北极运输系统货运基础的矿产资源中心进行了描述;按产品出口的运输类型对它们进行了分类。会议审议了在地缘政治条件发生变化的情况下改变与进入新市场有关的物流计划。铁路、内河、公路和航空运输不需要改变,因为它们主要提供国内运输。主要变化影响管道和海上运输。为了实现管道天然气货币化,扩大适合波罗的海和黑海港口装油码头的主要石油管道的吞吐能力,有必要在主要天然气管道吞吐能力差的海域沿岸出口点建设液化天然气生产设施。由于循环飞行时间的增加和油轮运费的增加,海运向亚洲石油出口市场的条件已经恶化。此外,由于缺乏高载重量货运船队和所需的北极冰级,对北海航线上石油出口到亚洲市场的货运量增加的可能性提出了质疑。关于需要根据目前的现实订正在其他政治和经济条件下通过的战略规划文件的建议是有道理的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Georesursy
Georesursy ENGINEERING, PETROLEUM-
CiteScore
1.50
自引率
25.00%
发文量
49
审稿时长
16 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信