Application of an integrated dissolved ozone flotation process in centralised fracturing wastewater treatment plant

IF 2.3 Q2 Environmental Science
Zhu Yao, Xin Jin, Jiaxin Liang, Wang Rui, P. Jin, Guangping Li, Yao Liushuan, Zhe Wang
{"title":"Application of an integrated dissolved ozone flotation process in centralised fracturing wastewater treatment plant","authors":"Zhu Yao, Xin Jin, Jiaxin Liang, Wang Rui, P. Jin, Guangping Li, Yao Liushuan, Zhe Wang","doi":"10.2166/WRD.2021.096","DOIUrl":null,"url":null,"abstract":"\n To solve the problems of unstable chemical oxygen demand (COD), turbidity and suspended solid (SS) removal for the electrocatalytic process and unstable operation of the subsequent ultrafiltration membrane–reverse osmosis membrane in a centralised fracturing wastewater treatment plant in Inner Mongolia, the integrated dissolved ozone flotation (DOF) process was proposed to replace the original electrocatalytic process. Multiple processes, such as ozonation, flotation, coagulation and decolourisation, can be achieved in one integrated DOF reactor. The results showed that the removal efficiency of COD, colour, turbidity and SS in the DOF process could reach 25.4, 49.9, 95 and 96%, respectively. Meanwhile, the treatment cost was reduced by 47% (i.e., 1.77 RMB/m3 for the DOF process) compared with the electrocatalytic process.","PeriodicalId":17556,"journal":{"name":"Journal of Water Reuse and Desalination","volume":" ","pages":""},"PeriodicalIF":2.3000,"publicationDate":"2021-03-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Water Reuse and Desalination","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2166/WRD.2021.096","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Environmental Science","Score":null,"Total":0}
引用次数: 5

Abstract

To solve the problems of unstable chemical oxygen demand (COD), turbidity and suspended solid (SS) removal for the electrocatalytic process and unstable operation of the subsequent ultrafiltration membrane–reverse osmosis membrane in a centralised fracturing wastewater treatment plant in Inner Mongolia, the integrated dissolved ozone flotation (DOF) process was proposed to replace the original electrocatalytic process. Multiple processes, such as ozonation, flotation, coagulation and decolourisation, can be achieved in one integrated DOF reactor. The results showed that the removal efficiency of COD, colour, turbidity and SS in the DOF process could reach 25.4, 49.9, 95 and 96%, respectively. Meanwhile, the treatment cost was reduced by 47% (i.e., 1.77 RMB/m3 for the DOF process) compared with the electrocatalytic process.
一体化溶解臭氧浮选工艺在集中压裂废水处理厂的应用
为解决内蒙古某压裂废水集中处理厂电催化过程化学需氧量(COD)、浊度和悬浮物(SS)去除不稳定以及后续超滤膜-反渗透膜运行不稳定的问题,提出了一体化溶解臭氧浮选(DOF)工艺来取代原有的电催化工艺。在一个集成的DOF反应器中可以实现臭氧氧化、浮选、混凝和脱色等多种工艺。结果表明,DOF工艺对COD、色度、浊度和SS的去除率分别达到25.4%、49.9%、95%和96%。同时,与电催化工艺相比,处理成本降低了47%(即DOF工艺降低了1.77元/m3)。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Journal of Water Reuse and Desalination
Journal of Water Reuse and Desalination ENGINEERING, ENVIRONMENTAL-WATER RESOURCES
CiteScore
4.30
自引率
0.00%
发文量
23
审稿时长
16 weeks
期刊介绍: Journal of Water Reuse and Desalination publishes refereed review articles, theoretical and experimental research papers, new findings and issues of unplanned and planned reuse. The journal welcomes contributions from developing and developed countries.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信