Factors for Time and Cost Overrun in Public Projects

Q2 Business, Management and Accounting
Shehryar Idrees, M. Shafiq
{"title":"Factors for Time and Cost Overrun in Public Projects","authors":"Shehryar Idrees, M. Shafiq","doi":"10.2478/jeppm-2021-0023","DOIUrl":null,"url":null,"abstract":"Abstract The construction industry in Pakistan is experiencing a surge in public sector projects due to major investments in infrastructure projects. Project delays and cost overrun are common features in public sector construction projects in Pakistan. Therefore, an understanding of the causes of time and cost overrun in public projects is essential. This paper investigates delay and cost overrun factors within the context of public sector projects in Pakistan. This study identifies 48 potential factors from existing literature and semi-structured interviews were used to refine the identified factors into ten categories. A questionnaire survey was used to establish a hierarchy of factors using descriptive statistics. The results showed that the major causes of time overruns in public projects were (1) legal issues, such as court stay orders, land acquisition, relocation of public facilities; (2) technical errors leading to low-quality drawings, rework, and errors at bidding stage; and (3) Poor project management. The findings of this research contribute to understanding the causes of project delays in public sector projects in Pakistan.","PeriodicalId":53274,"journal":{"name":"Journal of Engineering Project and Production Management","volume":"11 1","pages":"243 - 254"},"PeriodicalIF":0.0000,"publicationDate":"2021-05-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"9","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Engineering Project and Production Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/jeppm-2021-0023","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Business, Management and Accounting","Score":null,"Total":0}
引用次数: 9

Abstract

Abstract The construction industry in Pakistan is experiencing a surge in public sector projects due to major investments in infrastructure projects. Project delays and cost overrun are common features in public sector construction projects in Pakistan. Therefore, an understanding of the causes of time and cost overrun in public projects is essential. This paper investigates delay and cost overrun factors within the context of public sector projects in Pakistan. This study identifies 48 potential factors from existing literature and semi-structured interviews were used to refine the identified factors into ten categories. A questionnaire survey was used to establish a hierarchy of factors using descriptive statistics. The results showed that the major causes of time overruns in public projects were (1) legal issues, such as court stay orders, land acquisition, relocation of public facilities; (2) technical errors leading to low-quality drawings, rework, and errors at bidding stage; and (3) Poor project management. The findings of this research contribute to understanding the causes of project delays in public sector projects in Pakistan.
公共项目中时间和成本超支的因素
由于基础设施项目的重大投资,巴基斯坦的建筑业正在经历公共部门项目的激增。项目延误和成本超支是巴基斯坦公共部门建设项目的共同特点。因此,了解公共项目中时间和成本超支的原因是必不可少的。本文研究了巴基斯坦公共部门项目背景下的延迟和成本超支因素。本研究从现有文献中确定了48个潜在因素,并采用半结构化访谈将确定的因素细化为10个类别。问卷调查是用来建立一个层次的因素使用描述性统计。结果表明,公共项目工期超期的主要原因有:(1)法律问题,如法院暂缓令、征地、公共设施搬迁等;(2)技术错误导致图纸质量不高、返工、投标阶段出现错误的;(3)项目管理不善。本研究的结果有助于理解巴基斯坦公共部门项目延误的原因。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Journal of Engineering Project and Production Management
Journal of Engineering Project and Production Management Business, Management and Accounting-Business, Management and Accounting (miscellaneous)
CiteScore
2.30
自引率
0.00%
发文量
24
审稿时长
30 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信