Modeling financial risk contributes to construction projects; case study of expansion food industries

Q2 Engineering
Nouran A. Gad, M. Abdel-Monem, K. El-Dash, Mohamed Abdel-Hamid
{"title":"Modeling financial risk contributes to construction projects; case study of expansion food industries","authors":"Nouran A. Gad, M. Abdel-Monem, K. El-Dash, Mohamed Abdel-Hamid","doi":"10.1080/16874048.2022.2086779","DOIUrl":null,"url":null,"abstract":"ABSTRACT The allocation of financial risks among project stakeholders is an important decision affecting the project success after the unexpected political and economic changes took place in Egypt and changes from 2011-2016. Some financial risks in a project are uncontrollable and impacted project stakeholders. Therefore, the research focuses on the know -how of applying modelling financial risk management from different perspectives. This paper presents FRAM is a dynamic model to identify and assess financial factors of risks with reference to project stakeholders; an owner/developer , contractor, financial agencies/ banks and project management companies before construction phase takes place using multi analysis tools.","PeriodicalId":31454,"journal":{"name":"HBRC Journal","volume":"18 1","pages":"85 - 106"},"PeriodicalIF":0.0000,"publicationDate":"2022-06-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"HBRC Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/16874048.2022.2086779","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 1

Abstract

ABSTRACT The allocation of financial risks among project stakeholders is an important decision affecting the project success after the unexpected political and economic changes took place in Egypt and changes from 2011-2016. Some financial risks in a project are uncontrollable and impacted project stakeholders. Therefore, the research focuses on the know -how of applying modelling financial risk management from different perspectives. This paper presents FRAM is a dynamic model to identify and assess financial factors of risks with reference to project stakeholders; an owner/developer , contractor, financial agencies/ banks and project management companies before construction phase takes place using multi analysis tools.
建设项目财务风险建模扩展食品工业的案例研究
摘要在埃及发生了意想不到的政治和经济变化以及2011-2016年的变化之后,项目利益相关者之间的财务风险分配是影响项目成功的一个重要决策。项目中的一些财务风险是不可控的,会影响项目利益相关者。因此,本研究从不同的角度关注如何应用建模财务风险管理。本文提出FRAM是一个参考项目利益相关者来识别和评估风险财务因素的动态模型;在施工阶段之前,业主/开发商、承包商、金融机构/银行和项目管理公司使用多种分析工具。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
2.00
自引率
0.00%
发文量
9
审稿时长
52 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信