{"title":"Detailed scheduling of forest harvesting at the operational level incorporating decisions on multiple machine assignment","authors":"Rohit Arora, T. Sowlati, Joel Mortyn","doi":"10.1080/14942119.2023.2185181","DOIUrl":null,"url":null,"abstract":"ABSTRACT It is crucial to efficiently schedule harvesting activities in order to reduce the delivered cost of logs. Mathematical models have been used to optimize the harvest scheduling at the operational level. However, in the existing literature, the number of machines assigned for each activity at each cut block was not considered as a decision variable. Also, the impact of the slope of cut blocks on the precedence relationship between harvesting activities was not considered in tprevious studies. In this work, a mathematical model is developed with the possibility of assigning multiple machines for the same harvest activity at each cut block, considering the precedence relationship between activities based on the slope of cut blocks in order to minimize the total cost of harvesting. This work is an extension of our previous work on detailed scheduling of harvesting. The model is applied to the harvesting operations of a large forest company in Coastal British Columbia, Canada. The model’s result for operating cost is only 3.3% higher than the lowest possible operating cost. Only one machine has an idle time. For the same case study, the total cost of the developed model is about 34% lower than that of the previous model.","PeriodicalId":55998,"journal":{"name":"International Journal of Forest Engineering","volume":null,"pages":null},"PeriodicalIF":2.1000,"publicationDate":"2023-03-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Forest Engineering","FirstCategoryId":"97","ListUrlMain":"https://doi.org/10.1080/14942119.2023.2185181","RegionNum":3,"RegionCategory":"农林科学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"FORESTRY","Score":null,"Total":0}
引用次数: 1

Abstract

ABSTRACT It is crucial to efficiently schedule harvesting activities in order to reduce the delivered cost of logs. Mathematical models have been used to optimize the harvest scheduling at the operational level. However, in the existing literature, the number of machines assigned for each activity at each cut block was not considered as a decision variable. Also, the impact of the slope of cut blocks on the precedence relationship between harvesting activities was not considered in tprevious studies. In this work, a mathematical model is developed with the possibility of assigning multiple machines for the same harvest activity at each cut block, considering the precedence relationship between activities based on the slope of cut blocks in order to minimize the total cost of harvesting. This work is an extension of our previous work on detailed scheduling of harvesting. The model is applied to the harvesting operations of a large forest company in Coastal British Columbia, Canada. The model’s result for operating cost is only 3.3% higher than the lowest possible operating cost. Only one machine has an idle time. For the same case study, the total cost of the developed model is about 34% lower than that of the previous model.
结合多台机器分配决策的操作层面的森林采伐详细计划
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
3.70
自引率
21.10%
发文量
33
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信