{"title":"ANALISIS LIFE CYCLE COST PADA PROYEK JEMBATAN MERAH PUTIH DI KOTA AMBON DENGAN PENDEKATAN NILAI EKUIVALENSI","authors":"Hans Dermawan, Christy Vianty Patty","doi":"10.29103/tj.v12i2.769","DOIUrl":null,"url":null,"abstract":"The rapid development of infrastructure is the main thing for the government in Ambon City to increase the community's economic growth. One of the infrastructures that are a priority for the local government is the Merah Putih Bridge in Ambon, which was built in 2011. This study aims to identify cost components, such as initial costs, operating costs, and maintenance costs from 2017 to 2020, and evaluate bridge maintenance costs for the next 100 years. The life cycle cost method with an equivalence value approach as a research method. The results of this study for the total life cycle cost of the Merah Putih Bridge are initial costs of Rp731,578,760,000 (96.26%), operational costs of Rp2,338,600,000 (0.31%) and maintenance costs of Rp27,138,274,698 (3.43%), so that the total life cycle costs of Rp761,055,634,698 were obtained. The structural maintenance cost component is the highest cost component that needs to be considered so that the financing for the maintenance of the Merah Putih Bridge in Ambon city can be maintained.","PeriodicalId":52898,"journal":{"name":"Teras Jurnal Jurnal Teknik Sipil","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-09-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Teras Jurnal Jurnal Teknik Sipil","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29103/tj.v12i2.769","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
The rapid development of infrastructure is the main thing for the government in Ambon City to increase the community's economic growth. One of the infrastructures that are a priority for the local government is the Merah Putih Bridge in Ambon, which was built in 2011. This study aims to identify cost components, such as initial costs, operating costs, and maintenance costs from 2017 to 2020, and evaluate bridge maintenance costs for the next 100 years. The life cycle cost method with an equivalence value approach as a research method. The results of this study for the total life cycle cost of the Merah Putih Bridge are initial costs of Rp731,578,760,000 (96.26%), operational costs of Rp2,338,600,000 (0.31%) and maintenance costs of Rp27,138,274,698 (3.43%), so that the total life cycle costs of Rp761,055,634,698 were obtained. The structural maintenance cost component is the highest cost component that needs to be considered so that the financing for the maintenance of the Merah Putih Bridge in Ambon city can be maintained.