{"title":"Construction SMEs labour productivity: causal layered analysis","authors":"O. Adebowale, J. Agumba","doi":"10.1108/jedt-11-2022-0583","DOIUrl":null,"url":null,"abstract":"\nPurpose\nSmall and medium-sized contractors are critical to micro and macroeconomic performance. These contractors in South Africa have long been confronted with the problem of business failure because of a plethora of factors, including poor productivity. The purpose of this study is to investigate salient issues undermining the productivity of small and medium-sized contractors in South Africa. This study proposes alternative possibilities to engender productivity improvement.\n\n\nDesign/methodology/approach\nQualitative data were collected using semi-structured interviews with 15 contractors in Gauteng Province, South Africa. The research data were analysed using content and causal layered analyses.\n\n\nFindings\nChallenges to contractors’ productivity were associated with inadequately skilled workers, management competence and political factors. Skills development, construction business and political factors were dominant stakeholders’ perceptions. Metaphors for construction labour productivity are presented and reconstructed as alternative directions for productivity improvement.\n\n\nPractical implications\nContractors lose a substantial amount of South African Rand to poor productivity. Alternative directions provided in this study can be leveraged to increase profitability in construction organizations, enhance the social well-being of South Africans and ultimately improve the contribution of contractors to the South African economy.\n\n\nOriginality/value\nThe causal layered analysis (CLA) applied in this study is novel to construction labour productivity research. The four connected layers of CLA, which make a greater depth of inquiry possible, were explored to investigate labour productivity in construction organizations.\n","PeriodicalId":46533,"journal":{"name":"Journal of Engineering Design and Technology","volume":" ","pages":""},"PeriodicalIF":2.6000,"publicationDate":"2023-08-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Engineering Design and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/jedt-11-2022-0583","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"ENGINEERING, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 0
Abstract
Purpose
Small and medium-sized contractors are critical to micro and macroeconomic performance. These contractors in South Africa have long been confronted with the problem of business failure because of a plethora of factors, including poor productivity. The purpose of this study is to investigate salient issues undermining the productivity of small and medium-sized contractors in South Africa. This study proposes alternative possibilities to engender productivity improvement.
Design/methodology/approach
Qualitative data were collected using semi-structured interviews with 15 contractors in Gauteng Province, South Africa. The research data were analysed using content and causal layered analyses.
Findings
Challenges to contractors’ productivity were associated with inadequately skilled workers, management competence and political factors. Skills development, construction business and political factors were dominant stakeholders’ perceptions. Metaphors for construction labour productivity are presented and reconstructed as alternative directions for productivity improvement.
Practical implications
Contractors lose a substantial amount of South African Rand to poor productivity. Alternative directions provided in this study can be leveraged to increase profitability in construction organizations, enhance the social well-being of South Africans and ultimately improve the contribution of contractors to the South African economy.
Originality/value
The causal layered analysis (CLA) applied in this study is novel to construction labour productivity research. The four connected layers of CLA, which make a greater depth of inquiry possible, were explored to investigate labour productivity in construction organizations.
期刊介绍:
- Design strategies - Usability and adaptability - Material, component and systems performance - Process control - Alternative and new technologies - Organizational, management and research issues - Human factors - Environmental, quality and health and safety issues - Cost and life cycle issues - Sustainability criteria, indicators, measurement and practices - Risk management - Entrepreneurship Law, regulation and governance - Design, implementing, managing and practicing innovation - Visualization, simulation, information and communication technologies - Education practices, innovation, strategies and policy issues.