{"title":"Integrating exploratory factor analysis and fuzzy AHP models for assessing the factors affecting the performance of building construction projects: The case of Ethiopia","authors":"Girmay Getawa Ayalew, G. Ayalew, Meseret Getnet Meharie","doi":"10.1080/23311916.2023.2243724","DOIUrl":null,"url":null,"abstract":"Abstract Project performance is a critical issue for the construction industry. The construction industry is complex in its nature because it contains a large number of parties involved in the planning, execution, and monitoring of all types of civil works. Moreover, construction industries are always unique and heterogeneous; they will always encounter many unforeseen events that will negatively affect the construction everywhere, and the construction projects suffer from many problems and complex issues in the performance of building projects. Therefore, the study was focused on assessing the factors affecting the performance of building projects. The study would employ an integrated methodology of factor analysis and fuzzy AHP methods. First, the factor analysis is used to classify and reduce the input variables and their variable coefficients are determined. Second, fuzzy AHP is used to determine the preference weights of the input variables, and for ranking. To achieve this objective, data were collected from primary and secondary sources. This study used an integrated methodology as a data analysis method, and SPSS software version 23 and Microsoft Excel were used as analysis tools. The study pointed out that project location (0.083), changes in design (0.068), market fluctuation (0.067), financial difficulties (0.066), and size of the project (0.064) are identified as the most significant factors that affect the performance of building construction projects. Finally, it can be recommended that the practitioners take appropriate actions in improving the performance of building projects, and the methodologies can be implemented to demonstrate its practicality.","PeriodicalId":10464,"journal":{"name":"Cogent Engineering","volume":" ","pages":""},"PeriodicalIF":2.1000,"publicationDate":"2023-08-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Cogent Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/23311916.2023.2243724","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"ENGINEERING, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 0

Abstract

Abstract Project performance is a critical issue for the construction industry. The construction industry is complex in its nature because it contains a large number of parties involved in the planning, execution, and monitoring of all types of civil works. Moreover, construction industries are always unique and heterogeneous; they will always encounter many unforeseen events that will negatively affect the construction everywhere, and the construction projects suffer from many problems and complex issues in the performance of building projects. Therefore, the study was focused on assessing the factors affecting the performance of building projects. The study would employ an integrated methodology of factor analysis and fuzzy AHP methods. First, the factor analysis is used to classify and reduce the input variables and their variable coefficients are determined. Second, fuzzy AHP is used to determine the preference weights of the input variables, and for ranking. To achieve this objective, data were collected from primary and secondary sources. This study used an integrated methodology as a data analysis method, and SPSS software version 23 and Microsoft Excel were used as analysis tools. The study pointed out that project location (0.083), changes in design (0.068), market fluctuation (0.067), financial difficulties (0.066), and size of the project (0.064) are identified as the most significant factors that affect the performance of building construction projects. Finally, it can be recommended that the practitioners take appropriate actions in improving the performance of building projects, and the methodologies can be implemented to demonstrate its practicality.
综合探索性因素分析和模糊AHP模型评估影响建筑施工项目绩效的因素——以埃塞俄比亚为例
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Cogent Engineering
Cogent Engineering ENGINEERING, MULTIDISCIPLINARY-
CiteScore
4.00
自引率
5.30%
发文量
213
审稿时长
13 weeks
期刊介绍: One of the largest, multidisciplinary open access engineering journals of peer-reviewed research, Cogent Engineering, part of the Taylor & Francis Group, covers all areas of engineering and technology, from chemical engineering to computer science, and mechanical to materials engineering. Cogent Engineering encourages interdisciplinary research and also accepts negative results, software article, replication studies and reviews.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信