{"title":"Robust optimization for U-shaped assembly line worker assignment and balancing problem with uncertain task times","authors":"Ö. Yılmaz","doi":"10.17535/crorr.2020.0018","DOIUrl":null,"url":null,"abstract":"Awareness of the importance of U-shaped assembly line balancing problems is all on the rise. In the U-shaped assembly line, balancing is affected by the uncertainty associated with the assembly task times. Therefore, it is crucial to develop an approach to respond to the uncertainty caused by the task times. When the great majority of existing literature related to uncertainty in the assembly line is considered, it is observed that the U-shaped assembly line balancing problem under uncertainty is scarcely investigated. That being the case, we aim to fill this research gap by proposing a robust counterpart formulation for the addressed problem. In this study, a robust optimization model is developed for the U-shaped assembly line worker assignment and balancing problem (UALWABP) to cope with the task time uncertainty characterized by a combined interval and polyhedral uncertainty set. A real case study is conducted through data from a company producing water meters.","PeriodicalId":44065,"journal":{"name":"Croatian Operational Research Review","volume":"11 1","pages":"229-239"},"PeriodicalIF":0.5000,"publicationDate":"2020-12-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Croatian Operational Research Review","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.17535/crorr.2020.0018","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ECONOMICS","Score":null,"Total":0}
引用次数: 7
Abstract
Awareness of the importance of U-shaped assembly line balancing problems is all on the rise. In the U-shaped assembly line, balancing is affected by the uncertainty associated with the assembly task times. Therefore, it is crucial to develop an approach to respond to the uncertainty caused by the task times. When the great majority of existing literature related to uncertainty in the assembly line is considered, it is observed that the U-shaped assembly line balancing problem under uncertainty is scarcely investigated. That being the case, we aim to fill this research gap by proposing a robust counterpart formulation for the addressed problem. In this study, a robust optimization model is developed for the U-shaped assembly line worker assignment and balancing problem (UALWABP) to cope with the task time uncertainty characterized by a combined interval and polyhedral uncertainty set. A real case study is conducted through data from a company producing water meters.
期刊介绍:
Croatian Operational Research Review (CRORR) is the journal which publishes original scientific papers from the area of operational research. The purpose is to publish papers from various aspects of operational research (OR) with the aim of presenting scientific ideas that will contribute both to theoretical development and practical application of OR. The scope of the journal covers the following subject areas: linear and non-linear programming, integer programing, combinatorial and discrete optimization, multi-objective programming, stohastic models and optimization, scheduling, macroeconomics, economic theory, game theory, statistics and econometrics, marketing and data analysis, information and decision support systems, banking, finance, insurance, environment, energy, health, neural networks and fuzzy systems, control theory, simulation, practical OR and applications. The audience includes both researchers and practitioners from the area of operations research, applied mathematics, statistics, econometrics, intelligent methods, simulation, and other areas included in the above list of topics. The journal has an international board of editors, consisting of more than 30 editors – university professors from Croatia, Slovenia, USA, Italy, Germany, Austria and other coutries.