A DOSE to compare the level of performance between construction projects

IF 1.6 Q3 MANAGEMENT
T. Alemu, M. S. Thakur
{"title":"A DOSE to compare the level of performance between construction projects","authors":"T. Alemu, M. S. Thakur","doi":"10.2478/otmcj-2022-0017","DOIUrl":null,"url":null,"abstract":"Abstract The aim of this paper was to compare the level of performance (success) of construction projects between selected countries based on the concept of iron triangle. Following this, the major construction delays, cost overruns and quality factors were identified through an in-depth review of previous research works conducted in Denmark, Nigeria and Gaza Strip. The aggregate impacts of these factors were computed and compared between these countries. The results show that in the case of Denmark, the aggregate impact of the factors responsible for delay, cost overrun and poor quality was found in the impact interval between [0.60–0.80], but in the case of Gaza Strip and Nigeria, the aggregate impacts were found in the impact interval between [0.80–1.0]. This shows that construction projects in Denmark are found to be performed better relative to Nigeria and Gaza Strip.","PeriodicalId":42309,"journal":{"name":"Organization Technology and Management in Construction","volume":"14 1","pages":"2760 - 2768"},"PeriodicalIF":1.6000,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Organization Technology and Management in Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/otmcj-2022-0017","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 1

Abstract

Abstract The aim of this paper was to compare the level of performance (success) of construction projects between selected countries based on the concept of iron triangle. Following this, the major construction delays, cost overruns and quality factors were identified through an in-depth review of previous research works conducted in Denmark, Nigeria and Gaza Strip. The aggregate impacts of these factors were computed and compared between these countries. The results show that in the case of Denmark, the aggregate impact of the factors responsible for delay, cost overrun and poor quality was found in the impact interval between [0.60–0.80], but in the case of Gaza Strip and Nigeria, the aggregate impacts were found in the impact interval between [0.80–1.0]. This shows that construction projects in Denmark are found to be performed better relative to Nigeria and Gaza Strip.
用于比较不同建设项目绩效水平的指标
摘要本文的目的是基于铁三角的概念,比较选定国家之间建设项目的绩效(成功)水平。在此之后,通过深入审查先前在丹麦、尼日利亚和加沙地带进行的研究工作,确定了主要的施工延误、成本超支和质量因素。对这些因素的总体影响进行了计算,并在这些国家之间进行了比较。结果表明,在丹麦的情况下,造成延误、成本超支和质量差的因素的总体影响在[0.60-0.80]之间的影响区间内,但在加沙地带和尼日利亚的情况下,总体影响出现在[0.80-1.0]之间的影响区间。这表明丹麦的建筑项目相对于尼日利亚和加沙地带表现更好。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
3.10
自引率
0.00%
发文量
8
审稿时长
16 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信