Case study on barriers to building information modelling implementation in Malaysia

IF 2.2 Q3 MANAGEMENT
Praveena Munianday, Rahimi A. Rahman, M. Esa
{"title":"Case study on barriers to building information modelling implementation in Malaysia","authors":"Praveena Munianday, Rahimi A. Rahman, M. Esa","doi":"10.1108/jfm-10-2021-0132","DOIUrl":null,"url":null,"abstract":"\nPurpose\nThere is a dearth of studies conducted by local academics on actual building information modelling (BIM) projects to analyse the actual hurdles of BIM adoption. The majority of BIM research focuses on the technology’s general advantages, disadvantages, issues and limitations. In addition, research on actual BIM projects that have integrated BIM throughout the project is necessary to increase the current low number of BIM users in Malaysia. Consequently, the purpose of this study is to examine the challenges BIM adopters experience while implementing BIM in their projects and how they overcome them.\n\n\nDesign/methodology/approach\nAn in-depth interview session was used to collect data based on a case-study methodology. In Malaysia, three BIM projects were chosen, given the available resources. To evaluate the data in this qualitative study, NVivo was used.\n\n\nFindings\nAccording to the findings, the most important elements influencing the adoption of new technology and innovation were people and capital. The most significant impediments to BIM adoption are the appraisal of time and finances, as well as the tolerance of changes in approach.\n\n\nOriginality/value\nCollaborative training and BIM education have been the most explored solutions for reducing BIM difficulties. As a result, these concerns and solutions should be investigated and implemented to ensure project success and fully use technological innovation.\n","PeriodicalId":46544,"journal":{"name":"Journal of Facilities Management","volume":null,"pages":null},"PeriodicalIF":2.2000,"publicationDate":"2022-11-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Facilities Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/jfm-10-2021-0132","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 1

Abstract

Purpose There is a dearth of studies conducted by local academics on actual building information modelling (BIM) projects to analyse the actual hurdles of BIM adoption. The majority of BIM research focuses on the technology’s general advantages, disadvantages, issues and limitations. In addition, research on actual BIM projects that have integrated BIM throughout the project is necessary to increase the current low number of BIM users in Malaysia. Consequently, the purpose of this study is to examine the challenges BIM adopters experience while implementing BIM in their projects and how they overcome them. Design/methodology/approach An in-depth interview session was used to collect data based on a case-study methodology. In Malaysia, three BIM projects were chosen, given the available resources. To evaluate the data in this qualitative study, NVivo was used. Findings According to the findings, the most important elements influencing the adoption of new technology and innovation were people and capital. The most significant impediments to BIM adoption are the appraisal of time and finances, as well as the tolerance of changes in approach. Originality/value Collaborative training and BIM education have been the most explored solutions for reducing BIM difficulties. As a result, these concerns and solutions should be investigated and implemented to ensure project success and fully use technological innovation.
在马来西亚建立信息模型实施的障碍案例研究
目的本地学者缺乏对实际建筑信息模型(BIM)项目进行的研究,以分析采用BIM的实际障碍。大多数BIM研究都集中在该技术的总体优势、劣势、问题和局限性上。此外,有必要研究在整个项目中集成BIM的实际BIM项目,以增加马来西亚目前BIM用户数量较少的情况。因此,本研究的目的是研究BIM采用者在项目中实施BIM时遇到的挑战以及他们如何克服这些挑战。设计/方法/方法采用深度访谈的方式收集基于案例研究方法的数据。在马来西亚,考虑到现有资源,选择了三个BIM项目。为了评估本定性研究中的数据,使用了NVivo。调查结果根据调查结果,影响采用新技术和创新的最重要因素是人和资本。BIM采用的最大障碍是对时间和财务的评估,以及对方法变化的容忍度。创意/价值协同培训和BIM教育一直是减少BIM困难的探索最多的解决方案。因此,应该调查和实施这些问题和解决方案,以确保项目成功并充分利用技术创新。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
4.30
自引率
15.80%
发文量
56
期刊介绍: Journal of Facilities Management is a strategic level journal for Heads of Facilities and Corporate Real Estate. Guided by its international and expert Editorial Board, Journal of Facilities Management publishes high-quality, authoritative, and detailed analysis, briefings and case studies on how facilities can and do play a vital part in helping deliver corporate strategy. This quarterly publication features contributions from leading practitioners and thinkers in the field of Facilities Management, from some of the leading companies, government institutions, and universities in the world. The journal features a combination of theoretical and practical articles, complemented by a wide range of case studies and regular features, identifying key implications for senior practitioners in Facilities Management.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信