BIM-BASED PROTOTYPE OF A MATHEMATICAL MODEL OF CONSTRUCTION PLANNING

IF 4.3 3区 工程技术 Q1 ENGINEERING, CIVIL
Robertas Kontrimovičius, L. Ustinovichius
{"title":"BIM-BASED PROTOTYPE OF A MATHEMATICAL MODEL OF CONSTRUCTION PLANNING","authors":"Robertas Kontrimovičius, L. Ustinovichius","doi":"10.3846/jcem.2023.18313","DOIUrl":null,"url":null,"abstract":"This article tackles the problem of rational and effective planning of the entire construction site, including the planning of mechanisms, equipment, warehouse space, temporary buildings, temporary engineering networks, etc. The authors propose the principles of creating a mathematical model to calculate the needs of construction objects, using the photogrammetry model. The problems raised can be solved with the use of BIM in the preparation for construction planning stage. The prototype mathematical model presented in this article addresses these issues: identify current situation, using photogrammetry model, define optimal number and location of construction site objects, avoid conflicts between cranes, detect possible hoisting problem, avoid overload of cranes, and of course construction site planning. Therefore, it becomes possible to perform a multicriteria decision-making analysis. Extensive analysis in the pre-construction stage is often abandoned due to the lack of data on the current situation, difficult calculations of the need for mechanisms, equipment and simply due to the lack of time to analyze all possible rational solutions. The data received from the created mathematical prototype could also be used in further construction stages for planning human and material resources, the project schedule and cost estimate.","PeriodicalId":15524,"journal":{"name":"Journal of Civil Engineering and Management","volume":" ","pages":""},"PeriodicalIF":4.3000,"publicationDate":"2023-01-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Civil Engineering and Management","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.3846/jcem.2023.18313","RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 0

Abstract

This article tackles the problem of rational and effective planning of the entire construction site, including the planning of mechanisms, equipment, warehouse space, temporary buildings, temporary engineering networks, etc. The authors propose the principles of creating a mathematical model to calculate the needs of construction objects, using the photogrammetry model. The problems raised can be solved with the use of BIM in the preparation for construction planning stage. The prototype mathematical model presented in this article addresses these issues: identify current situation, using photogrammetry model, define optimal number and location of construction site objects, avoid conflicts between cranes, detect possible hoisting problem, avoid overload of cranes, and of course construction site planning. Therefore, it becomes possible to perform a multicriteria decision-making analysis. Extensive analysis in the pre-construction stage is often abandoned due to the lack of data on the current situation, difficult calculations of the need for mechanisms, equipment and simply due to the lack of time to analyze all possible rational solutions. The data received from the created mathematical prototype could also be used in further construction stages for planning human and material resources, the project schedule and cost estimate.
基于bim的建筑规划数学模型原型
本文解决了整个施工现场合理有效规划的问题,包括机构、设备、仓库空间、临时建筑、临时工程网络等的规划。作者提出了使用摄影测量模型创建数学模型来计算施工对象需求的原则。所提出的问题可以通过在施工规划准备阶段使用BIM来解决。本文提出的原型数学模型解决了这些问题:识别现状,使用摄影测量模型,定义施工现场物体的最佳数量和位置,避免起重机之间的冲突,检测可能的吊装问题,避免起重机过载,当然还有施工现场规划。因此,可以执行多准则决策分析。施工前阶段的广泛分析往往被放弃,原因是缺乏有关当前情况的数据,难以计算对机构和设备的需求,而且仅仅是因为缺乏时间来分析所有可能的合理解决方案。从创建的数学原型中收到的数据也可以用于进一步的施工阶段,用于规划人力和物力资源、项目进度和成本估算。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
6.70
自引率
4.70%
发文量
0
审稿时长
1.7 months
期刊介绍: The Journal of Civil Engineering and Management is a peer-reviewed journal that provides an international forum for the dissemination of the latest original research, achievements and developments. We publish for researchers, designers, users and manufacturers in the different fields of civil engineering and management. The journal publishes original articles that present new information and reviews. Our objective is to provide essential information and new ideas to help improve civil engineering competency, efficiency and productivity in world markets. The Journal of Civil Engineering and Management publishes articles in the following fields: building materials and structures, structural mechanics and physics, geotechnical engineering, road and bridge engineering, urban engineering and economy, constructions technology, economy and management, information technologies in construction, fire protection, thermoinsulation and renovation of buildings, labour safety in construction.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信