A Nonproportional Premium Rating Method for Construction Risks

IF 1.4 Q3 BUSINESS, FINANCE
Daniel M. Abramson
{"title":"A Nonproportional Premium Rating Method for Construction Risks","authors":"Daniel M. Abramson","doi":"10.1080/10920277.2022.2036197","DOIUrl":null,"url":null,"abstract":"Correct pricing of nonproportional (primary or excess of loss) insurance for construction risks must consider not only how the insured property values build up over time, but also how the probable maximum loss (PML) changes. Conventional pricing methods for static property risks cannot be employed for construction risks, since the latter are characterized by PML patterns that change over time, as well as evolving loss exposures and perils arising from the various phases of the construction project. A further complication arises when delay in startup (DSU) is covered, because a DSU loss is triggered by a property damage loss and both losses contribute jointly to the erosion of an excess layer. This article describes a pricing method with analysis of specific cases of interest, including guidelines for creating practical excess of loss rating models.","PeriodicalId":46812,"journal":{"name":"North American Actuarial Journal","volume":"26 1","pages":"626 - 645"},"PeriodicalIF":1.4000,"publicationDate":"2022-03-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"North American Actuarial Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/10920277.2022.2036197","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"BUSINESS, FINANCE","Score":null,"Total":0}
引用次数: 1

Abstract

Correct pricing of nonproportional (primary or excess of loss) insurance for construction risks must consider not only how the insured property values build up over time, but also how the probable maximum loss (PML) changes. Conventional pricing methods for static property risks cannot be employed for construction risks, since the latter are characterized by PML patterns that change over time, as well as evolving loss exposures and perils arising from the various phases of the construction project. A further complication arises when delay in startup (DSU) is covered, because a DSU loss is triggered by a property damage loss and both losses contribute jointly to the erosion of an excess layer. This article describes a pricing method with analysis of specific cases of interest, including guidelines for creating practical excess of loss rating models.
建筑工程风险的非比例保费评级方法
建筑风险的非比例(主要或超额损失)保险的正确定价不仅必须考虑被保险财产价值如何随着时间的推移而积累,还必须考虑可能的最大损失(PML)如何变化。静态财产风险的传统定价方法不能用于建筑风险,因为后者的特点是随着时间的推移而变化的PML模式,以及建筑项目各个阶段产生的不断变化的损失敞口和风险。当包含启动延迟(DSU)时,会出现更复杂的情况,因为DSU损失是由财产损失触发的,而这两种损失共同导致了多余层的侵蚀。本文描述了一种定价方法,并分析了具体的利益案例,包括创建实际超额损失评级模型的指南。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
2.80
自引率
14.30%
发文量
38
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信