Sistem Pengukuran Kinerja Supply Chain Management Pada Proyek Konstruksi

Demi Ramadian, Elita Amrina
{"title":"Sistem Pengukuran Kinerja Supply Chain Management Pada Proyek Konstruksi","authors":"Demi Ramadian, Elita Amrina","doi":"10.25077/JOSI.V18.N1.P75-85.2019","DOIUrl":null,"url":null,"abstract":"Construction project implementation process is often found inefficiency and problems at every stage of the construction process. Inefficiencies are caused because construction projects have high levels of fragmentation. The high level of fragmentation cannot be separated from the complexity and many work items on construction projects. To reduce the problem of inefficiencies in the implementation of construction projects required good supply chain management or better known as supply chain management (SCM) on construction projects. Therefore it is necessary to study the management of SCM in the construction project to reduce the inefficiency that occurred. SCM management of construction projects is done by designing SCM performance measurement systems in construction projects. This performance measurement system produces indicators that are combined with the Supply Chain Operation Reference (SCOR) method. So it helps in performing SCM performance measurement on construction projects. From the design results, obtained 14 SCM performance indicators on construction projects. The performance indicators are then used to perform SCM performance measurement of cement plant construction projects. From the measurement results obtained SCM performance value of 41 from a scale of 100. This shows the performance of SCM on construction projects for the construction of the cement plant is at a marginal level.","PeriodicalId":30702,"journal":{"name":"Jurnal Optimasi Sistem Industri","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-05-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Optimasi Sistem Industri","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.25077/JOSI.V18.N1.P75-85.2019","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Construction project implementation process is often found inefficiency and problems at every stage of the construction process. Inefficiencies are caused because construction projects have high levels of fragmentation. The high level of fragmentation cannot be separated from the complexity and many work items on construction projects. To reduce the problem of inefficiencies in the implementation of construction projects required good supply chain management or better known as supply chain management (SCM) on construction projects. Therefore it is necessary to study the management of SCM in the construction project to reduce the inefficiency that occurred. SCM management of construction projects is done by designing SCM performance measurement systems in construction projects. This performance measurement system produces indicators that are combined with the Supply Chain Operation Reference (SCOR) method. So it helps in performing SCM performance measurement on construction projects. From the design results, obtained 14 SCM performance indicators on construction projects. The performance indicators are then used to perform SCM performance measurement of cement plant construction projects. From the measurement results obtained SCM performance value of 41 from a scale of 100. This shows the performance of SCM on construction projects for the construction of the cement plant is at a marginal level.
一个监管链监管系统
建设项目实施过程中经常发现低效和问题,出现在建设过程的各个阶段。造成效率低下的原因是建筑项目高度分散。高度的碎片化离不开建筑项目的复杂性和许多工作项目。为了减少建筑项目实施中效率低下的问题,需要对建筑项目进行良好的供应链管理或更为人所知的供应链控制。因此,有必要对建设项目中的供应链管理进行研究,以减少出现的低效率。建设项目的供应链管理是通过设计建设项目供应链绩效衡量系统来实现的。该绩效衡量系统产生的指标与供应链运营参考(SCOR)方法相结合。因此,它有助于对建设项目进行供应链管理绩效评估。从设计结果中,得到了14个SCM在建设项目上的绩效指标。然后将绩效指标用于水泥厂建设项目的供应链管理绩效测量。从测量结果中获得SCM性能值为41(满分为100)。由此可见,供应链管理对水泥厂建设项目的绩效处于边际水平。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
0.80
自引率
0.00%
发文量
6
审稿时长
13 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书